Study on Structural Stability of Mined Large-Span Tunnels Constructed by Two Arch-Cover Methods in Upper-Soft and Lower-Hard Rock Stratum of Qingdao Area
(China Railway Tunnel Consultants Co., Ltd. , Guangzhou 511400)
Download: PDF (5316KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As for the upper-soft and lower-hard rock stratum with larger stiffness differences in vertical depth, the arch-cover method is developed based on the cover-excavation method and double side heading method. The archcover method includes the arch-cover method with double-layer primary support and the arch-cover method with secondly lining. Taking a mined large-span station of Qingdao metro as an example, a numerical analysis on structural stability of the tunnel constructed by two arch-over methods is conducted in light of the characteristics of the upper-soft and lower-hard rock stratum. The results show that: (1) as for the arch-cover method with secondary lining, when tunnel is constructed at a safe strut dismantling distance of 9 m in longitudinal direction, the "spatial stiffness effect" of shed protection of outer primary support can′ t make up for the "arch" effect of arch-cover, the construction technology of arch-cover method with double-layer primary support is more conducive to tunnel deformation control; (2) the arch-cover structure has significant bearing and protection functions during excavating the lower part of the tunnel, however, the plastic damage of rock mass at arch springing is more obvious during the construction by arch-cover method with secondary lining under the same geological conditions, in other words, the arch springing of secondary lining requires higher strength and rigidity of the rock foundation; (3) the internal force con? trol positions of structure by arch-cover method with double-layer primary support are spandrel and arch springing,and the control position is the arch springing for the structure by arch-cover method with secondary lining, the control internal force of arch springing of the latter is about 1.56 times of that of the former, the "beam" effect of the former is more obvious while the "foot" effect of the latter is more obvious; (4) from the perspective of safety, it is suggested that the arch-cover method with double-layer primary support should be adopted.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SHI Yujing
KeywordsArch-cover method with double-layer primary support   Arch-cover method with secondary lining   Up? per-soft and lower-hard stratum   Settlement   Plastic zone   Internal force analysis   Engineering cost-performance ratio     
Abstract: As for the upper-soft and lower-hard rock stratum with larger stiffness differences in vertical depth, the arch-cover method is developed based on the cover-excavation method and double side heading method. The archcover method includes the arch-cover method with double-layer primary support and the arch-cover method with secondly lining. Taking a mined large-span station of Qingdao metro as an example, a numerical analysis on structural stability of the tunnel constructed by two arch-over methods is conducted in light of the characteristics of the upper-soft and lower-hard rock stratum. The results show that: (1) as for the arch-cover method with secondary lining, when tunnel is constructed at a safe strut dismantling distance of 9 m in longitudinal direction, the "spatial stiffness effect" of shed protection of outer primary support can′ t make up for the "arch" effect of arch-cover, the construction technology of arch-cover method with double-layer primary support is more conducive to tunnel deformation control; (2) the arch-cover structure has significant bearing and protection functions during excavating the lower part of the tunnel, however, the plastic damage of rock mass at arch springing is more obvious during the construction by arch-cover method with secondary lining under the same geological conditions, in other words, the arch springing of secondary lining requires higher strength and rigidity of the rock foundation; (3) the internal force con? trol positions of structure by arch-cover method with double-layer primary support are spandrel and arch springing,and the control position is the arch springing for the structure by arch-cover method with secondary lining, the control internal force of arch springing of the latter is about 1.56 times of that of the former, the "beam" effect of the former is more obvious while the "foot" effect of the latter is more obvious; (4) from the perspective of safety, it is suggested that the arch-cover method with double-layer primary support should be adopted.
KeywordsArch-cover method with double-layer primary support,   Arch-cover method with secondary lining,   Up? per-soft and lower-hard stratum,   Settlement,   Plastic zone,   Internal force analysis,   Engineering cost-performance ratio     
Cite this article:   
SHI Yujing .Study on Structural Stability of Mined Large-Span Tunnels Constructed by Two Arch-Cover Methods in Upper-Soft and Lower-Hard Rock Stratum of Qingdao Area[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(2): 117-126
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I2/117
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[13] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[14] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[15] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY