Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom
(1 Key Laboratory of Highway Engineering Ministry of Educationin Special Areas, Chang′an University, Xi′an 710064; 2 Management Department of the First Phase of CCCC Foshan Urban Rail Transit Line 2, Foshan 528000)
Download: PDF (2424KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Compared with other sections of a shield tunnel, the engineering geology and hydrogeological conditions of the shield tunnel section passing through river are more complex, especially in southern China where the seasonal precipitation is large, the surface and underground water levels change obviously. Taking certain section of the shield tunnel on Foshan metro line 2 as the research object, it carries out a numerical analysis on segments usingAbaqus finite element software based on a beam-spring model, and verifies with the measured axial forces of segments. The results show the earth pressure on segment is slightly smaller than that calculated by the full-covered earth pressure method; water pressure around the shield tunnel has great influence on internal force of segment, the fissure water and confined water in rock stratum should be taken into account in the design of segment even if the rock layer above shield tunnel is poor in water permeability,and the earth pressure acting on segment is calculated with the full-covered earth pressure for the sake of security.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2
KeywordsShield tunnel beneath river bottom   Beam-spring model   High water pressure   Numerical analysis     
Abstract: Compared with other sections of a shield tunnel, the engineering geology and hydrogeological conditions of the shield tunnel section passing through river are more complex, especially in southern China where the seasonal precipitation is large, the surface and underground water levels change obviously. Taking certain section of the shield tunnel on Foshan metro line 2 as the research object, it carries out a numerical analysis on segments usingAbaqus finite element software based on a beam-spring model, and verifies with the measured axial forces of segments. The results show the earth pressure on segment is slightly smaller than that calculated by the full-covered earth pressure method; water pressure around the shield tunnel has great influence on internal force of segment, the fissure water and confined water in rock stratum should be taken into account in the design of segment even if the rock layer above shield tunnel is poor in water permeability,and the earth pressure acting on segment is calculated with the full-covered earth pressure for the sake of security.
KeywordsShield tunnel beneath river bottom,   Beam-spring model,   High water pressure,   Numerical analysis     
Cite this article:   
ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2 .Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 85-90
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/85
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[13] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[14] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
[15] WU Bo.Research on Blasting Optimization of Urban Large Cross-section Tunnel Passing through Stratified Sandstone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 115-121
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY