Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway
(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing 102600)
Download: PDF (3402KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction of high-speed railway tunnel beneath an expressway is characterized by small intersec? tion angle, shallow buried depth, large section, long construction period and high safety risk. Based on the situation of certain super-shallow high-speed railway tunnel beneath an expressway, it systematically studies the construction technology and proposes a cover-cut method: partial road of expressway above the tunnel is closed by regions and the unclosed road keeps normal traffic; the envelop enclosure and cover plate of road in the closed area are con?structed by regions to make the whole section of expressway underneath be paved with the cover plate and resume normal traffic;the foundation pit is excavated under the protection of envelop enclosure and the cover plate, and the tunnel main structure is constructed in foundation pit; gap between top of tunnel main structure and cover plate is filled so as to complete the cover-cut construction of the super-shallow tunnel with large span beneath an expressway. With this technology, the road of expressway above the tunnel is closed by regions, with short occupation time, no effect on normal traffic,unnecessity of road change, and little environmental impact.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Qiang
KeywordsHigh-speed railway tunnel   Super-shallow overburden   Passing underneath   Expressway   Cover-cut method   Construction technique     
Abstract: The construction of high-speed railway tunnel beneath an expressway is characterized by small intersec? tion angle, shallow buried depth, large section, long construction period and high safety risk. Based on the situation of certain super-shallow high-speed railway tunnel beneath an expressway, it systematically studies the construction technology and proposes a cover-cut method: partial road of expressway above the tunnel is closed by regions and the unclosed road keeps normal traffic; the envelop enclosure and cover plate of road in the closed area are con?structed by regions to make the whole section of expressway underneath be paved with the cover plate and resume normal traffic;the foundation pit is excavated under the protection of envelop enclosure and the cover plate, and the tunnel main structure is constructed in foundation pit; gap between top of tunnel main structure and cover plate is filled so as to complete the cover-cut construction of the super-shallow tunnel with large span beneath an expressway. With this technology, the road of expressway above the tunnel is closed by regions, with short occupation time, no effect on normal traffic,unnecessity of road change, and little environmental impact.
KeywordsHigh-speed railway tunnel,   Super-shallow overburden,   Passing underneath,   Expressway,   Cover-cut method,   Construction technique     
Cite this article:   
LI Qiang .Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 161-166
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/161
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY