MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (3) :161-166    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway
(China Railway Fifth Survey and Design Institute Group Co.,Ltd.,Beijing 102600)
Download: PDF (3402KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction of high-speed railway tunnel beneath an expressway is characterized by small intersec? tion angle, shallow buried depth, large section, long construction period and high safety risk. Based on the situation of certain super-shallow high-speed railway tunnel beneath an expressway, it systematically studies the construction technology and proposes a cover-cut method: partial road of expressway above the tunnel is closed by regions and the unclosed road keeps normal traffic; the envelop enclosure and cover plate of road in the closed area are con?structed by regions to make the whole section of expressway underneath be paved with the cover plate and resume normal traffic;the foundation pit is excavated under the protection of envelop enclosure and the cover plate, and the tunnel main structure is constructed in foundation pit; gap between top of tunnel main structure and cover plate is filled so as to complete the cover-cut construction of the super-shallow tunnel with large span beneath an expressway. With this technology, the road of expressway above the tunnel is closed by regions, with short occupation time, no effect on normal traffic,unnecessity of road change, and little environmental impact.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LI Qiang
KeywordsHigh-speed railway tunnel   Super-shallow overburden   Passing underneath   Expressway   Cover-cut method   Construction technique     
Abstract: The construction of high-speed railway tunnel beneath an expressway is characterized by small intersec? tion angle, shallow buried depth, large section, long construction period and high safety risk. Based on the situation of certain super-shallow high-speed railway tunnel beneath an expressway, it systematically studies the construction technology and proposes a cover-cut method: partial road of expressway above the tunnel is closed by regions and the unclosed road keeps normal traffic; the envelop enclosure and cover plate of road in the closed area are con?structed by regions to make the whole section of expressway underneath be paved with the cover plate and resume normal traffic;the foundation pit is excavated under the protection of envelop enclosure and the cover plate, and the tunnel main structure is constructed in foundation pit; gap between top of tunnel main structure and cover plate is filled so as to complete the cover-cut construction of the super-shallow tunnel with large span beneath an expressway. With this technology, the road of expressway above the tunnel is closed by regions, with short occupation time, no effect on normal traffic,unnecessity of road change, and little environmental impact.
KeywordsHigh-speed railway tunnel,   Super-shallow overburden,   Passing underneath,   Expressway,   Cover-cut method,   Construction technique     
Cite this article:   
LI Qiang .Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 161-166
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/161
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[13] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[14] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[15] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY