MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (3) :204-208    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Design, Manufacture and Application of the Lining Formwork for Oil and Gas Pipeline Tunnels
(China Petroleum Pipeline Construction Engineering Co., Ltd., Langfang 065001)
Download: PDF (3273KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The problem of insufficient clearance at the lower part is encountered when the traditional lining trolley is applied to the oil and gas pipeline tunnel with small section, and it blocks construction machinery to go through,results in construction in single tunnel construction process and so slows construction progress.The renovations of miniaturization and automation are conducted by taking the techniques of full-fit of gantry and formwork, slip bearings, integral formwork lifting and automatic control in order to maximize the clearance and make it possible for the construction machinery to pass through and realize synchronous construction of tunnel excavation, primary support and secondary lining installation as well as semi-automatic control of formwork erection in the oil and gas pipeline tunnel. The case application shows that the renovated lining formwork for the oil and gas pipeline tunnel can greatly improve construction safety, quality and efficiency and shorten construction period.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Ming HU Qian WANG Zhixi JIAO Xinlu
KeywordsOil and gas pipeline tunnel   Tunnel lining   Lining formwork   Design     
Abstract: The problem of insufficient clearance at the lower part is encountered when the traditional lining trolley is applied to the oil and gas pipeline tunnel with small section, and it blocks construction machinery to go through,results in construction in single tunnel construction process and so slows construction progress.The renovations of miniaturization and automation are conducted by taking the techniques of full-fit of gantry and formwork, slip bearings, integral formwork lifting and automatic control in order to maximize the clearance and make it possible for the construction machinery to pass through and realize synchronous construction of tunnel excavation, primary support and secondary lining installation as well as semi-automatic control of formwork erection in the oil and gas pipeline tunnel. The case application shows that the renovated lining formwork for the oil and gas pipeline tunnel can greatly improve construction safety, quality and efficiency and shorten construction period.
KeywordsOil and gas pipeline tunnel,   Tunnel lining,   Lining formwork,   Design     
Cite this article:   
LIU Ming HU Qian WANG Zhixi JIAO Xinlu .Design, Manufacture and Application of the Lining Formwork for Oil and Gas Pipeline Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 204-208
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I3/204
 
No references of article
[1] MA Hui1 GAO Mingzhong2.Discussion on the Construction Management of Sichuan-Tibet Railway Tunnel Based on System Engineering Methodology[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 1-8
[2] WANG Mingnian1,2 GUO Xiaohan1,2 YU Li1,2 LI Chunhui1,2 CHEN Shuwang3.Study on the Location Selection of Emergency Rescue Station of the Extra-long Railway Tunnel at High Altitude[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 9-14
[3] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[4] LIAO Jun1 DONG Qian1 LIANG Hongyong2 JIAN Bo2 SHI Yuchuan1,3 GONG Hongwei1.Preliminary Study on the Classification Indexes of Surrounding Rock for the Highway Tunnel in Nearly Horizontal Red-bed Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 25-29
[5] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[6] ZHONG Zuliang1,2 GAO Guofu1, 2 CHEN Peng1 YAN Ru1.Discussion on Design for the Liangjiang Ship Sightseeing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 36-42
[7] HUANG Fujie HE Zegan ZHANG Weimin LIU Shanshan.Application Research of BIM Technology in Engineering Design of the Immersed Tube Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 43-48
[8] TANG Xiaosong1, 2 ZHENG Yingren3 WANG Yongfu1.Application of FEM Strength Reduction Method in Stability Analysis and Control of Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 49-55
[9] WU Bo1,2 LAN Yangbin1,2 YANG Shisheng1,2 YANG Jianxin3 PANG Xiaoyu3.Study on Stability of Surrounding Rock Based on Strength Reduction Dynamic Analysis Method[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 56-64
[10] ZHOU Cuiying1,2 LI Ang2,3 LIU Zhen1,2.Study on the Influence of Parallel Fold Structure on Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 65-74
[11] MA Li1 LIU Yapeng2 LI Sheng3,4 LV Wenda5 XIE Chao3,4 DAI Jinpeng3,4.Study on the Mechanical Behaviors of High-filled Loess Arched Open Cut Tunnel under Different Load Reduction Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 75-84
[12] ZHANG Bingwu1 ZHANG Peng1 DAI Zhenhua2 WU Yinghe2 LUO Wei2.Analysis of the Mechanical Behavior of Segments of the Shield-driven Metro Tunnel beneath River Bottom[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 85-90
[13] SUI Xin1 ZHANG Zhengwei1 MING Xuan2 DOWNIE Steven3 PADHANI Shahid3 ZHAO Libo4.Numerical Simulation Analysis of SF6 Gas Leakage in Extra-Long GIL Utility Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 91-98
[14] ZHANG Kefeng.Numerical Simulation of Water Burst in Roadway Excavation with Karst Cave Ahead[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 99-107
[15] ZHANG Yan1, 2 WANG Wei2 DENG Xueqin2.Prediction Model of TBM Advance Rate Based on Relevance Vector Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 108-114
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY