MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :1-11    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground
(China Railway Southwest Research Institute Co., Ltd., Chengdu 611731)
Download: PDF (3703KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Squeezing of weak rock is essentially associated with creep caused by exceeding a limiting shear stress. In case of high in-situ stress, large deformation of surrounding rock may occur. During the deformation, a so called“genuine rock pressure”builds up and acts on the support structures according to“convergence-confinement”model. The load jointly borne by support and rock mass is different from the“discrete pressure”due to weight of discrete body and it might be called“genuine pressure”. Restrained by the understanding of discrete pressure load, it is difficult to find the reasonable means to deal with squeezing deformation. Several issues of the tunnel in squeezing rock mass are discussed in terms of the characteristics of genuine pressure, and it points out that the feasible solution in heavily squeezing ground is to release the genuine rock pressure by application of a yielding support system in combination with a certain amount of over-excavation, whereas the amount of over-excavation may be reduced by use of untensioned rock bolts.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Jianyu
KeywordsTunnel   High in-situ stress   Weak surrounding rock   Squeezing deformation   Discrete pressure   Genu? ine rock pressure;Yielding support   Rock bolting   Secondary lining installation time     
Abstract: Squeezing of weak rock is essentially associated with creep caused by exceeding a limiting shear stress. In case of high in-situ stress, large deformation of surrounding rock may occur. During the deformation, a so called“genuine rock pressure”builds up and acts on the support structures according to“convergence-confinement”model. The load jointly borne by support and rock mass is different from the“discrete pressure”due to weight of discrete body and it might be called“genuine pressure”. Restrained by the understanding of discrete pressure load, it is difficult to find the reasonable means to deal with squeezing deformation. Several issues of the tunnel in squeezing rock mass are discussed in terms of the characteristics of genuine pressure, and it points out that the feasible solution in heavily squeezing ground is to release the genuine rock pressure by application of a yielding support system in combination with a certain amount of over-excavation, whereas the amount of over-excavation may be reduced by use of untensioned rock bolts.
KeywordsTunnel,   High in-situ stress,   Weak surrounding rock,   Squeezing deformation,   Discrete pressure,   Genu? ine rock pressure;Yielding support,   Rock bolting,   Secondary lining installation time     
Cite this article:   
WANG Jianyu .The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 1-11
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/1
 
No references of article
[1] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[2] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[3] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[4] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[5] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[6] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[7] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[8] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[9] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[10] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[11] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[12] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[13] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[14] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[15] MI Shipeng.Research on Soil Plug Pressure-bearing Characteristics of Screw Conveyor with Variable Pitch[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 119-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY