Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :37-42    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel
(China Railway Engineering Equipment Group Co.,Ltd.,Zhengzhou 450016)
Download: PDF (3101KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Aiming at the Gaoligongshan tunnel with large buried depth and complex geology, in order to accurately understand the geological conditions in front of the working face during the TBM construction, a set of advanced geological prediction system, which can be mounted on TBM equipment is designed by taking the characteristics of TBM equipment into consideration. The system consists of a three-dimensional induced polarization instrument and a three-dimensional seismograph. By innovatively designing of built-in telescopic electrode on the cutterhead and shield, using the rotary joint of integrated brush to transmit the electrode signal of the cutterhead, and using rotary hammer, it solves the problems of poor adaptability, long forecast period, influence on construction efficiency and difficult loading of the traditional D&B method geological forecasting system on TBM. The application result indicates the system is easy to operate, it is fast and accurately to acquire signal, and the prediction results are accurate and reliable.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao
KeywordsGaoligongshan tunnel   TBM construction   Advance geological forecast   Three-dimensional induced po? larization method   Three-dimensional seismic method     
Abstract: Aiming at the Gaoligongshan tunnel with large buried depth and complex geology, in order to accurately understand the geological conditions in front of the working face during the TBM construction, a set of advanced geological prediction system, which can be mounted on TBM equipment is designed by taking the characteristics of TBM equipment into consideration. The system consists of a three-dimensional induced polarization instrument and a three-dimensional seismograph. By innovatively designing of built-in telescopic electrode on the cutterhead and shield, using the rotary joint of integrated brush to transmit the electrode signal of the cutterhead, and using rotary hammer, it solves the problems of poor adaptability, long forecast period, influence on construction efficiency and difficult loading of the traditional D&B method geological forecasting system on TBM. The application result indicates the system is easy to operate, it is fast and accurately to acquire signal, and the prediction results are accurate and reliable.
KeywordsGaoligongshan tunnel,   TBM construction,   Advance geological forecast,   Three-dimensional induced po? larization method,   Three-dimensional seismic method     
Cite this article:   
YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao .Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 37-42
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/37
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[6] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[7] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[8] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[9] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[10] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[11] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[12] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[13] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[14] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[15] MI Shipeng.Research on Soil Plug Pressure-bearing Characteristics of Screw Conveyor with Variable Pitch[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 119-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY