Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :91-97    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu, Sichuan 610031; 2. School of Civil Engineering, Shijiazhuang TieDao University, Shijiazhuang, Hebei 050043; 3 Fuzhou Municipal Construction Development Co., Ltd, Fuzhou 350108;4 Fuzhou Planning Design & Research Institute, Fuzhou 350108)
Download: PDF (1319KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The existing ultimate displacement and its management reference are mainly determined after the clo? sure of supporting structure of the common railway tunnel section, without considering the tunnel construction stages.Taking the existing high-speed railway tunnel which locates in surrounding rock of grade Ⅴ and adopts three bench method for example, it simulates the vault displacements in different construction stages by FLAC3D software, obtains the ultimate vault displacements in different construction stages based on cusp catastrophe theory. The results show that the ultimate vault displacements are affected by excavation of upper bench, middle bench, lower bench and invert in decending order and there is almost no effect by lower bench and invert excavation in the case of threebench construction in the surrounding rock of grade Ⅴ; under the calculated buried depth of 50-300 m, the ultimate displacement at vault in the same construction stage has a linear relationship with the buried depth. The sensitivities of surrounding rock parameters to the ultimate displacements are analyzed by grey correlation, and the influence de? grees on the ultimate vault displacement are rock mass density ρ, elasticity modulus E, cohesive force c, poisson rate μ and internal friction angel φ in descending order.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4
KeywordsHigh-speed railway tunnel   Ultimate displacement   Cusp catastrophe theory   FLAC3D software   Parame? ter sensitivity     
Abstract: The existing ultimate displacement and its management reference are mainly determined after the clo? sure of supporting structure of the common railway tunnel section, without considering the tunnel construction stages.Taking the existing high-speed railway tunnel which locates in surrounding rock of grade Ⅴ and adopts three bench method for example, it simulates the vault displacements in different construction stages by FLAC3D software, obtains the ultimate vault displacements in different construction stages based on cusp catastrophe theory. The results show that the ultimate vault displacements are affected by excavation of upper bench, middle bench, lower bench and invert in decending order and there is almost no effect by lower bench and invert excavation in the case of threebench construction in the surrounding rock of grade Ⅴ; under the calculated buried depth of 50-300 m, the ultimate displacement at vault in the same construction stage has a linear relationship with the buried depth. The sensitivities of surrounding rock parameters to the ultimate displacements are analyzed by grey correlation, and the influence de? grees on the ultimate vault displacement are rock mass density ρ, elasticity modulus E, cohesive force c, poisson rate μ and internal friction angel φ in descending order.
KeywordsHigh-speed railway tunnel,   Ultimate displacement,   Cusp catastrophe theory,   FLAC3D software,   Parame? ter sensitivity     
Cite this article:   
ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4 .Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 91-97
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/91
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[6] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[7] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[8] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[9] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[10] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[11] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[12] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[13] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[14] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
[15] MI Shipeng.Research on Soil Plug Pressure-bearing Characteristics of Screw Conveyor with Variable Pitch[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 119-126
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY