Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :178-184    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Monitoring and Prevention Technique for Harmful Gas in No.1 Inclined Shaft of Hongdoushan Tunnel
(1 School of Geoscience and Technology, Southwest Petroleum University, Chengdu 610500;2 China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610036)
Download: PDF (2485KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract High-pressure harmful gas burst occurs in the No. 1 inclined shaft of Hongdoushan tunnel during the construction, and the high-pressure gas is mainly consist of CO2, H2S with high concentration, small amount of CO and H2 and other harmful gases, resulting in major safety risks for tunnel construction. Based on the characteristics of the harmful gas and the tunnel construction conditions, it presents a monitoring scheme mainly composing of automatic monitoring system and manual real-time inspection. By sorting out and analyzing the monitoring data, the concentration, distribution and escape characteristics of harmful gases are summarized, and a prevention technique for high-pressure and high-concentration harmful gases in advance drilling and working face drilling is proposed in light of the characteristics of different harmful gases, which mainly includes blowout prevention in advance drilling,real-time monitoring of gas pressure in boreholes, real-time monitoring of composition and concentration of harmful gas and ventilation velocity monitoring.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Zhongyong1 SU Peidong1 HUANG Lu1 CHEN Haodong1 DU Yuben2
KeywordsHigh-pressure harmful gas   CO2   H2S   Monitoring and prevention technique   Hongdoushan Tunnel     
Abstract: High-pressure harmful gas burst occurs in the No. 1 inclined shaft of Hongdoushan tunnel during the construction, and the high-pressure gas is mainly consist of CO2, H2S with high concentration, small amount of CO and H2 and other harmful gases, resulting in major safety risks for tunnel construction. Based on the characteristics of the harmful gas and the tunnel construction conditions, it presents a monitoring scheme mainly composing of automatic monitoring system and manual real-time inspection. By sorting out and analyzing the monitoring data, the concentration, distribution and escape characteristics of harmful gases are summarized, and a prevention technique for high-pressure and high-concentration harmful gases in advance drilling and working face drilling is proposed in light of the characteristics of different harmful gases, which mainly includes blowout prevention in advance drilling,real-time monitoring of gas pressure in boreholes, real-time monitoring of composition and concentration of harmful gas and ventilation velocity monitoring.
KeywordsHigh-pressure harmful gas,   CO2,   H2S,   Monitoring and prevention technique,   Hongdoushan Tunnel     
Cite this article:   
CHEN Zhongyong1 SU Peidong1 HUANG Lu1 CHEN Haodong1 DU Yuben2 .Study on Monitoring and Prevention Technique for Harmful Gas in No.1 Inclined Shaft of Hongdoushan Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 178-184
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/178
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[6] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[7] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[8] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[9] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[10] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[11] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[12] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[13] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[14] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[15] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY