Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :201-207    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Vertical Roof Ripping Construction Techniques for Excavation of Main Tunnel from Inclined Shaft: A Case Study of the Large-span Metro Tunnel in Soft Surrounding Rock
(1 China Communications Construction Company (Guangzhou) Ltd., Guangzhou 511458; 2 School of Mechanics and Civil Engineering,State Key Laboratory for Geomechanics & Deep Underground Engineering, China University of Mining and Technology, Xuzhou 221116)
Download: PDF (4833KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Aiming at the difficulty of deformation control during construction of main tunnel from inclined shaft for a three-line large-span tunnel in soft surrounding rock, a construction method suitable for vertical roof ripping construction of urban metro tunnel from inclined shaft is proposed by taking the roof ripping construction of Xinlian running tunnel of Shenzhen rail transit as an example, and the construction scheme, procedures and key points are described. Furthermore numerical simulation is adopted to explore the rationality of this construction method. The research results show that: (1) it is an effective way to take roof ripping construction through small pilot tunnel to climb into main tunnel with reinforced support at the intersection; (2) reinforced support at intersection of inclined shaft and main tunnel can solve the construction difficulty caused by large dimension gap between them; (3) roof ripping construction through small pilot tunnel climbing to main tunnel provides precondition for the installation of primary support of main tunnel arch frame and it is favorable for the main tunnel construction which switches to double sidewall construction later; (4) there is a stress relaxation zone of surrounding rock at intersection crown, and the rock mass displacement can be well controlled with roof ripping construction under the help of reinforced support.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Yi1 ZHANG Yong1 PENG Zhen1 CHEN Jiawei2 LI Yuanhai
KeywordsMetro tunnel   Excavating main tunnel from inclined shaft   Intersection   Small pilot tunnel   Climbing; Vertical roof ripping construction   Construction technique     
Abstract: Aiming at the difficulty of deformation control during construction of main tunnel from inclined shaft for a three-line large-span tunnel in soft surrounding rock, a construction method suitable for vertical roof ripping construction of urban metro tunnel from inclined shaft is proposed by taking the roof ripping construction of Xinlian running tunnel of Shenzhen rail transit as an example, and the construction scheme, procedures and key points are described. Furthermore numerical simulation is adopted to explore the rationality of this construction method. The research results show that: (1) it is an effective way to take roof ripping construction through small pilot tunnel to climb into main tunnel with reinforced support at the intersection; (2) reinforced support at intersection of inclined shaft and main tunnel can solve the construction difficulty caused by large dimension gap between them; (3) roof ripping construction through small pilot tunnel climbing to main tunnel provides precondition for the installation of primary support of main tunnel arch frame and it is favorable for the main tunnel construction which switches to double sidewall construction later; (4) there is a stress relaxation zone of surrounding rock at intersection crown, and the rock mass displacement can be well controlled with roof ripping construction under the help of reinforced support.
KeywordsMetro tunnel,   Excavating main tunnel from inclined shaft,   Intersection,   Small pilot tunnel,   Climbing; Vertical roof ripping construction,   Construction technique     
Cite this article:   
LIU Yi1 ZHANG Yong1 PENG Zhen1 CHEN Jiawei2 LI Yuanhai .Vertical Roof Ripping Construction Techniques for Excavation of Main Tunnel from Inclined Shaft: A Case Study of the Large-span Metro Tunnel in Soft Surrounding Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 201-207
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/201
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[6] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[7] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[8] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[9] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[10] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[11] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[12] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[13] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[14] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[15] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY