Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (4) :219-    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Structural Non-destructive Evaluation of Cleaning Solvent for Clogging Removing of Karst Tunnel Drainage System
(1 Nanchang Railway Survey and Design Institute Co., Ltd., Nanchang 330002;2 Communications Design & Research Institute Co. Ltd of Jiangxi Province, Nanchang 330200)
Download: PDF (4795KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Drainage system blocked by Karst crystal is often encountered in tunnelling in Karst area, threatening structure safety and long-term operation of tunnels. A unimolecule carboxylic organic acid agent with optimal concentration of 2 000 ppm and dichromate index of 17.71% is identified as a cleaning solvent based on a study of preparation and efficiency of cleaning solvent for removing of drainage clogging in karst tunnel, and a non-destructive evaluation of selected cleaning solvents on tunnel lining concrete and PVC plastic fiber materials of drainage system is conducted. Firstly, a test of organic acid solvent soaked concrete specimens is carried out to evaluate the strength damage of concrete due to erosion by solvent. Secondly, an experiment of soaking PVC drainage board and plastic blind ditch tube with organic acid reagent solution is carried out to evaluate the effect of solvent on quality loss and corrosion damage of tunnel drainage system from the macroscopic and microscopic perspectives. The results indicate that strength index of concrete material is reduced by about 7%-9% due to erosion of unimolecule carboxylic organic acid reagent, while it barely has any corrosion damage on the plastic material of drainage system.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HONG Yingwei1
2
KeywordsKarst Tunnel   Unimolecule carboxylic organic acid   Lining concrete   PVC drainage pipe   Cellosilk of plastic pipe for blind ditch   Structural non- destruction     
Abstract: Drainage system blocked by Karst crystal is often encountered in tunnelling in Karst area, threatening structure safety and long-term operation of tunnels. A unimolecule carboxylic organic acid agent with optimal concentration of 2 000 ppm and dichromate index of 17.71% is identified as a cleaning solvent based on a study of preparation and efficiency of cleaning solvent for removing of drainage clogging in karst tunnel, and a non-destructive evaluation of selected cleaning solvents on tunnel lining concrete and PVC plastic fiber materials of drainage system is conducted. Firstly, a test of organic acid solvent soaked concrete specimens is carried out to evaluate the strength damage of concrete due to erosion by solvent. Secondly, an experiment of soaking PVC drainage board and plastic blind ditch tube with organic acid reagent solution is carried out to evaluate the effect of solvent on quality loss and corrosion damage of tunnel drainage system from the macroscopic and microscopic perspectives. The results indicate that strength index of concrete material is reduced by about 7%-9% due to erosion of unimolecule carboxylic organic acid reagent, while it barely has any corrosion damage on the plastic material of drainage system.
KeywordsKarst Tunnel,   Unimolecule carboxylic organic acid,   Lining concrete,   PVC drainage pipe,   Cellosilk of plastic pipe for blind ditch,   Structural non- destruction     
Cite this article:   
HONG Yingwei1, 2 .Structural Non-destructive Evaluation of Cleaning Solvent for Clogging Removing of Karst Tunnel Drainage System[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(4): 219-
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I4/219
 
No references of article
[1] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[2] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[3] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[4] SUN Jianping TANG Zhaoping.Study and Evaluation on the Design Adaptability of Shield Cutterhead System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 27-36
[5] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[6] LIU Yuyang1 LAI Hongpeng2 WANG Minxing3 HE Qiumei4.Development and Application of Multi-point Independent Loading Testing System for Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 43-51
[7] ZHENG Aiyuan1 XU Bin2 CHEN Xiangsheng1.Study on Reliability of Steel Fiber Reinforced Concrete Segments of Metro in Marine Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 52-58
[8] CHEN Yunyao1,2 ZHANG Junwei1 MA Shiwei2 LI Xue1.Study on Design Parameters of Sealing Gasket for Segment Joints of Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 59-66
[9] REN Lei1 NIU Bin2 GUO Ting2 LIU Songyu2.Study on the Influence of Flexibility Ratio on Tunnel Seismic Dynamic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 67-73
[10] LIU Ping1 LIU Chi2 WANG Hongtao1 ZHANG Hongjun3 YANG Yong4 ZHANG Xin1 LIU Luyao1.Numerical Simulation Study on the Deformation and Failure Mechanism of Tunnel Surrounding Rock under the Effect of Water-rich Sand Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 74-81
[11] JIANG Yongtao1 WANG Mingnian1 ZHANG Yiteng1 YU Li1 JIANG Fan2 XIAO Zerong3.Prediction Method for Surface Settlement in Tunnel Construction with Pipe Curtain Support[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 82-90
[12] ZHANG Yiteng1 SUN Xingliang2 JIANG Yongtao1 YU Li1 JIANG Fan3 CHEN Mingyue3 XIAO Zerong4.Research on Vault Ultimate Displacement at Different Tunnel Construction Stages in Surrounding Rock of Grade Ⅴ[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 91-97
[13] WEN Shuli.Influence of Deep Foundation Pit Excavation on Adjacent Buildings and Optimization of Reinforcement Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 98-103
[14] ZHANG Jing1, 2.Study on Calculations and Influence Factors of Bending Stiffness of Segment Ring Joints of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 104-112
[15] WANG Chengjing ZHANG Yong ZHU Chengshan HAN Xiang.Analysis of Influence of Flowing Water in Tunnel on Freezing Effect of Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 113-118
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY