Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (5) :66-76    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
On Mechanism of Crystal Blockage of Tunnel Drainage System and Preventive Countermeasures
(1 School of Highway, Chang′an University, Xi′an 710064; 2 Yunnan Laman Expressway Co, Ltd, Xishuangbanna 666300)
Download: PDF (4109KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Crystal blockage in tunnel drainage pipe brings much trouble to tunnel construction and operation. Through field investigation and literature research, this paper analyzes the mechanism of crystallization and blockage of tunnel drainage pipe, and puts forward prevention suggestions. The main conclusions are as follows: The crystallization of tunnel drainage pipe is segmental, the crystallization of NaHCO3 underground water is serious in the tunnel under construction, the crystal composition is CaCO3, the pH and alkalinity of the solution flowing out of the primary support and drainage pipe are very high. In general, the lower the water flow rate, the greater the amount of crystallization. The crystallization and blockage of tunnel drainage pipe can be divided into four processes, i. e. chemical reaction between groundwater and shotcrete, concrete erosion by groundwater, crystal precipitation in drainage pipe solution and deposition blockage. In practical engineering, the four processes may occur simultaneously and interact with each other. The main factors affecting the crystallization and blockage of tunnel drainage pipe include the type of groundwater, the characteristics of shotcrete, the physical and chemical conditions of crystallization of drainage solution and the deposition condition of drainage pipe. Finally corresponding engineering suggestions are proposed from two perspectives of waterproof and drainage design and construction control.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
TIAN Chongming1 YE Fei1 SONG Guifeng2 WANG Qinglong2 ZHAO Meng1
KeywordsHighway tunnel   Drainange sytem   Crystallization   Investigation and survey   Mechanism   Engineering suggestion     
Abstract: Crystal blockage in tunnel drainage pipe brings much trouble to tunnel construction and operation. Through field investigation and literature research, this paper analyzes the mechanism of crystallization and blockage of tunnel drainage pipe, and puts forward prevention suggestions. The main conclusions are as follows: The crystallization of tunnel drainage pipe is segmental, the crystallization of NaHCO3 underground water is serious in the tunnel under construction, the crystal composition is CaCO3, the pH and alkalinity of the solution flowing out of the primary support and drainage pipe are very high. In general, the lower the water flow rate, the greater the amount of crystallization. The crystallization and blockage of tunnel drainage pipe can be divided into four processes, i. e. chemical reaction between groundwater and shotcrete, concrete erosion by groundwater, crystal precipitation in drainage pipe solution and deposition blockage. In practical engineering, the four processes may occur simultaneously and interact with each other. The main factors affecting the crystallization and blockage of tunnel drainage pipe include the type of groundwater, the characteristics of shotcrete, the physical and chemical conditions of crystallization of drainage solution and the deposition condition of drainage pipe. Finally corresponding engineering suggestions are proposed from two perspectives of waterproof and drainage design and construction control.
KeywordsHighway tunnel,   Drainange sytem,   Crystallization,   Investigation and survey,   Mechanism,   Engineering suggestion     
Cite this article:   
TIAN Chongming1 YE Fei1 SONG Guifeng2 WANG Qinglong2 ZHAO Meng1 .On Mechanism of Crystal Blockage of Tunnel Drainage System and Preventive Countermeasures[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(5): 66-76
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I5/66
 
No references of article
[1] YAN Jian1,2 WEI Yanqing3 HE Chuan1 ZHOU Zihan1 GOU Hao1.Hot-freeze Link Technology and Its Application in Snow Melting and Deicing of Tunnel Portal Section of Sichuan-Tibet Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 1-9
[2] YAN Xidong1 GAO Jun1 HAN Fei2 LI Zheng1.Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 10-22
[3] WANG Shuaishuai1,2 CHEN Guizhou2 GUO Chun2 BAI Yonghou3.On Power Performances of Tunnel Construction Machinery at High-altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 23-29
[4] GONG Chenjie1 YANG Junsheng1 FU Jinyang1, 2.Characteristics and Influencing Factors of Segment Cracking of LargeDiameter River-Crossing Shield Tunnelling in Composite Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 30-42
[5] ZHANG Xin.Research on Application of Random Source Model Based New Microtremor Survey Technology to Shield Tunnelling in Upper Soft and Lower Hard Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 43-50
[6] HUANG Zhongkai1 ZHANG Dongmei1,2.Seismic Vulnerability Analysis of the Shallow-buried Shield Tunnel in Soft Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 51-60
[7] JIANG Heng1 LIU Xuezeng2 ZHU Hehua1.Research on Crack Identification of Highway Tunnel Linings Based on Data Obtained from the Testing Vehicle[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 61-65
[8] LIU Sicong1 ZHAO Chengqiao2 MA Chenxiao1 PENG Fangle.Discussion on Connection Problems of Underground Space in Early CBD from the Perspective of Urban Renewal ——A Case of Lujiazui CBD[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 77-83
[9] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[10] SUN Yulong YAN Zhiguo.Study on Computation of Surrounding Rock Pressure of Super Large Span and Flat Underground Cavern Based on Process Load Concept[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 91-98
[11] ZHOU Zhong CHEN Yun MIAO Linwu. Study of Equivalent Layered Method Based Prediction Model for Deformations Caused by Construction of New Tunnels Undercrossing Existing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 99-103
[12] LV Xilin1,2 ZHAO Yucheng1,2 CAI Jiantao3.Numerical Simulation of Ground Subsidence Induced by Shield Tunnel Construction Disturbance in Water-rich Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 104-109
[13] CHEN Weijie1 SU Dong1,2 CHEN Xiangsheng1,2 PANG Xiaochao2,3 LEI Guoping1,2.Study on the Influence of Coefficients of Subgrade Reaction and Lateral Pressure on Deformation of the Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 110-115
[14] LV Jingfu1 DU Jiangmei1 LUO Zejun2,3 ZHANG Jinjiang1 MIU Yabiao1.Research on the Stability and Supporting Parameters of High-Steep Slope of Yankou Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 116-124
[15] WANG Zhichao XIE Yuan XIE Yongli.Analysis of Mechanical Properties of Innovative Support System in Loess Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 125-135
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY