Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2020, Vol. 57 Issue (5) :116-124    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on the Stability and Supporting Parameters of High-Steep Slope of Yankou Highway Tunnel
(1 Yunan Communications Investment & Construction Group Co., Ltd,Kunming, 650228;2 Department of Geotechnical Engineering,Tongji University,Shanghai 200092;3 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092)
Download: PDF (4959KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As for the tunnel portal section, it is characterized by steep slope, weak and fractured surrounding rock, which is easy to lead to the instability or insufficient strength of the slope. In this paper, based on the portal construction at the Dongchuan end of Yankou tunnel, the 3D finite element software is used to simulate the slope stability, the influence of sheet-pile reinforcement and tunnel excavation on the slope stability is studied, and the sensitivity analysis of the anti-slide pile support parameters is carried out. The results show that in the course of tunnel construction, the construction of portal is usually the most unfavorable stage; the stability of the slope under different working conditions is improved obviously when sheet-pile is used to reinforce the slope at the portal; with increase of embedded depth of pile, the maximum stress of pile decreases and the displacement of pile tip decreases; the impact of tunnel excavation on nearby railway can be effectively reduced by adopting sheet-pile support.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LV Jingfu1 DU Jiangmei1 LUO Zejun2
3 ZHANG Jinjiang1 MIU Yabiao1
KeywordsWeak surrounding rock   High-steep slope   Tunnel portal   Slope stability   Anti-slide pile   3D numeri? cal simulation     
Abstract: As for the tunnel portal section, it is characterized by steep slope, weak and fractured surrounding rock, which is easy to lead to the instability or insufficient strength of the slope. In this paper, based on the portal construction at the Dongchuan end of Yankou tunnel, the 3D finite element software is used to simulate the slope stability, the influence of sheet-pile reinforcement and tunnel excavation on the slope stability is studied, and the sensitivity analysis of the anti-slide pile support parameters is carried out. The results show that in the course of tunnel construction, the construction of portal is usually the most unfavorable stage; the stability of the slope under different working conditions is improved obviously when sheet-pile is used to reinforce the slope at the portal; with increase of embedded depth of pile, the maximum stress of pile decreases and the displacement of pile tip decreases; the impact of tunnel excavation on nearby railway can be effectively reduced by adopting sheet-pile support.
KeywordsWeak surrounding rock,   High-steep slope,   Tunnel portal,   Slope stability,   Anti-slide pile,   3D numeri? cal simulation     
Cite this article:   
LV Jingfu1 DU Jiangmei1 LUO Zejun2, 3 ZHANG Jinjiang1 MIU Yabiao1 .Research on the Stability and Supporting Parameters of High-Steep Slope of Yankou Highway Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(5): 116-124
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2020/V57/I5/116
 
No references of article
[1] YAN Jian1,2 WEI Yanqing3 HE Chuan1 ZHOU Zihan1 GOU Hao1.Hot-freeze Link Technology and Its Application in Snow Melting and Deicing of Tunnel Portal Section of Sichuan-Tibet Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 1-9
[2] YAN Xidong1 GAO Jun1 HAN Fei2 LI Zheng1.Risk Evaluation of the Tunnel Passing through Active Fault Zone and Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 10-22
[3] WANG Shuaishuai1,2 CHEN Guizhou2 GUO Chun2 BAI Yonghou3.On Power Performances of Tunnel Construction Machinery at High-altitude Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 23-29
[4] GONG Chenjie1 YANG Junsheng1 FU Jinyang1, 2.Characteristics and Influencing Factors of Segment Cracking of LargeDiameter River-Crossing Shield Tunnelling in Composite Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 30-42
[5] ZHANG Xin.Research on Application of Random Source Model Based New Microtremor Survey Technology to Shield Tunnelling in Upper Soft and Lower Hard Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 43-50
[6] HUANG Zhongkai1 ZHANG Dongmei1,2.Seismic Vulnerability Analysis of the Shallow-buried Shield Tunnel in Soft Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 51-60
[7] JIANG Heng1 LIU Xuezeng2 ZHU Hehua1.Research on Crack Identification of Highway Tunnel Linings Based on Data Obtained from the Testing Vehicle[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 61-65
[8] TIAN Chongming1 YE Fei1 SONG Guifeng2 WANG Qinglong2 ZHAO Meng1.On Mechanism of Crystal Blockage of Tunnel Drainage System and Preventive Countermeasures[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 66-76
[9] LIU Sicong1 ZHAO Chengqiao2 MA Chenxiao1 PENG Fangle.Discussion on Connection Problems of Underground Space in Early CBD from the Perspective of Urban Renewal ——A Case of Lujiazui CBD[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 77-83
[10] WANG Zhilong1,2 ZHOU Renqiang3 YANG Nie1,2 WANG Mingnian1,2 LIU Dagang1,2.Hoek-Brown Criterion Based Calculation Method of Rock Resistant Coefficient in Tunnelling and Its Engineering Application[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 84-90
[11] SUN Yulong YAN Zhiguo.Study on Computation of Surrounding Rock Pressure of Super Large Span and Flat Underground Cavern Based on Process Load Concept[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 91-98
[12] ZHOU Zhong CHEN Yun MIAO Linwu. Study of Equivalent Layered Method Based Prediction Model for Deformations Caused by Construction of New Tunnels Undercrossing Existing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 99-103
[13] LV Xilin1,2 ZHAO Yucheng1,2 CAI Jiantao3.Numerical Simulation of Ground Subsidence Induced by Shield Tunnel Construction Disturbance in Water-rich Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 104-109
[14] CHEN Weijie1 SU Dong1,2 CHEN Xiangsheng1,2 PANG Xiaochao2,3 LEI Guoping1,2.Study on the Influence of Coefficients of Subgrade Reaction and Lateral Pressure on Deformation of the Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 110-115
[15] WANG Zhichao XIE Yuan XIE Yongli.Analysis of Mechanical Properties of Innovative Support System in Loess Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 125-135
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY