Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :118-126    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Comparison and Selection of Construction Methods for Changsha-Ganzhou High-speed Railway Tunnel Section Adjacent to the Runway of Huanghua Airport
(1 China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063; 2 National-Local Joint Engineering Research Center of Underwater Tunnelling Technology, Wuhan 430063)
Download: PDF (6160KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract For the Changsha-Ganzhou High-speed Railway tunnel section adjacent to the runway of Huanghua Airport, strict surface settlement control is required during construction. In this paper, aiming at four common construction methods such as mined construction method, shield method, pipe-roof method and pipe jacking method,the calculation results of the stress of surrounding rock mass, the development of plastic zone and the surface settlement variation during the tunnel construction are compared and analyzed through numerical simulation analysis.The result shows that the surface settlement caused by the mined construction method is the largest with the value more than 2 cm, which has a great impact on the tunnel and surface buildings; regarding the shield method, the pipe roof method and the pipe jacking method, the excavation-induced settlement can be effectively controlled below 5mm, meeting the tunnel construction and airport operation safety requirements. Considering the factors such as cost and technical conditions, the pipe roof method is finally recommended for the construction of this tunnel section.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Jian1
2
KeywordsTunnel   Adjacent construction   Settlement   Mined method   Shield method   Pipe roof method   Pipe jack? ing method   Scheme comparison and selection   Numerical simulation     
Abstract: For the Changsha-Ganzhou High-speed Railway tunnel section adjacent to the runway of Huanghua Airport, strict surface settlement control is required during construction. In this paper, aiming at four common construction methods such as mined construction method, shield method, pipe-roof method and pipe jacking method,the calculation results of the stress of surrounding rock mass, the development of plastic zone and the surface settlement variation during the tunnel construction are compared and analyzed through numerical simulation analysis.The result shows that the surface settlement caused by the mined construction method is the largest with the value more than 2 cm, which has a great impact on the tunnel and surface buildings; regarding the shield method, the pipe roof method and the pipe jacking method, the excavation-induced settlement can be effectively controlled below 5mm, meeting the tunnel construction and airport operation safety requirements. Considering the factors such as cost and technical conditions, the pipe roof method is finally recommended for the construction of this tunnel section.
KeywordsTunnel,   Adjacent construction,   Settlement,   Mined method,   Shield method,   Pipe roof method,   Pipe jack? ing method,   Scheme comparison and selection,   Numerical simulation     
Cite this article:   
YANG Jian1, 2 .Comparison and Selection of Construction Methods for Changsha-Ganzhou High-speed Railway Tunnel Section Adjacent to the Runway of Huanghua Airport[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 118-126
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/118
 
No references of article
[1] YU Jie.Study on Reasonable Construction Method for Tunnels in Contact Zone of Red Clay and Sandstone Interbedded with Mudstone[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 174-181
[2] WU Jiancheng.Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 145-150
[3] LEI Shengxiang1 WANG Fei2 YU Jie2 SHAO Shengjun3 LIANG Qingguo4.Discussion on the Technological Development of Loess Tunnelling in the Future[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 1-7
[4] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[5] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[6] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[7] XU Xueliang1,2 MA Weibin1,2 CAI Degou1,2 AN Zheli1,2 CHAI Jinfei1,2.Research on Full-Life-Cycle Inspection and Monitoring System of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 31-40
[8] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[9] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[10] ZHANG Ziguang1 CAO Guangyong1,2 LI Jianli3 ZHAI Chaojiao1,2.Research on Safe Thickness of Overlying Rock Layer above Subway Tunnels in Upper-soft and Lower-hard Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 71-77
[11] WEN Xu1 PEI Xiangjun1 PEI Zuan1 YANG Hailong1 CHEN Zhenlin1 ZHANG Yichen2.Study on Structural Design and Safety of Shed Tunnels in the Scenic Area of Changbai Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 151-157
[12] WU Bo1,2 PENG Yiyong1,2 MENG Guowang1,2 PU Songquan3.Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 86-92
[13] HU Changming1,2 LI Liang1 MEI Yuan1,2 YUAN Yili1 WANG Zhiyu1.Global Sensitivity Analysis on Parameters of the Prediction Model for Shield Vertical Attitude[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 127-134
[14] GAO Xin WANG Wenjuan.Research on Reasonable Combination Forms and Mechanical Deformation Characteristics of Double-layer Superimposed Lining in Deep-buried Tunnels under the Action of Far-field Hydrostatic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 93-102
[15] YU Hongping1 SU Peidong2 ZHAO Tianbiao3 CHEN Dejun1 XU Xueyuan1 DU Yuben1.Study on Sources and Hazards of Crude Oil and Harmful Gases in Huangjialiang Tunnel on Xi′an-Chengdu Passenger Dedicated Line[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 182-187
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY