Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :145-150    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route
(Guangzhou Salvage Bureau, Guangzhou 510260)
Download: PDF (2934KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction window period of offshore immersed tunnel elements is short and the ocean environ? ment is complex and changeable. In order to ensure the safety and control of the tunnel elements during the towing process, it is necessary to study the motion response of the immersed tunnel elements under the action of the wind,waves and currents during the towing formation navigation, consider the yawing effect of the lateral deviation force generated by the wind, waves and currents on the tunnel element formation, and analyze the ability of the tugboat to correct the deviation of the tunnel element formation. Taking the floating of the tunnel elements of the lot S08 of the Shenzhen-Zhongshan sea-crossing project as an example, it introduces a numerical calculation method for the analysis of the squat of the tunnel elements during the towing process on long-distance and complex route through the calculation example of a certain tunnel element, and validates the calculation results through empirical formulas.Through the analysis of the motion response of the tunnel element, this paper proposes a deviation correction analysis procedure applicable for the towing process of the tunnel element and offers the corresponding control measures for related specific problems.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WU Jiancheng
KeywordsImmersed tunnel   Towing   Response analysis   Deviation correction analysis     
Abstract: The construction window period of offshore immersed tunnel elements is short and the ocean environ? ment is complex and changeable. In order to ensure the safety and control of the tunnel elements during the towing process, it is necessary to study the motion response of the immersed tunnel elements under the action of the wind,waves and currents during the towing formation navigation, consider the yawing effect of the lateral deviation force generated by the wind, waves and currents on the tunnel element formation, and analyze the ability of the tugboat to correct the deviation of the tunnel element formation. Taking the floating of the tunnel elements of the lot S08 of the Shenzhen-Zhongshan sea-crossing project as an example, it introduces a numerical calculation method for the analysis of the squat of the tunnel elements during the towing process on long-distance and complex route through the calculation example of a certain tunnel element, and validates the calculation results through empirical formulas.Through the analysis of the motion response of the tunnel element, this paper proposes a deviation correction analysis procedure applicable for the towing process of the tunnel element and offers the corresponding control measures for related specific problems.
KeywordsImmersed tunnel,   Towing,   Response analysis,   Deviation correction analysis     
Cite this article:   
WU Jiancheng .Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 145-150
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/145
 
No references of article
[1] YU Jie.Study on Reasonable Construction Method for Tunnels in Contact Zone of Red Clay and Sandstone Interbedded with Mudstone[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 174-181
[2] LEI Shengxiang1 WANG Fei2 YU Jie2 SHAO Shengjun3 LIANG Qingguo4.Discussion on the Technological Development of Loess Tunnelling in the Future[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 1-7
[3] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[4] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[5] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[6] XU Xueliang1,2 MA Weibin1,2 CAI Degou1,2 AN Zheli1,2 CHAI Jinfei1,2.Research on Full-Life-Cycle Inspection and Monitoring System of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 31-40
[7] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[8] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[9] ZHANG Ziguang1 CAO Guangyong1,2 LI Jianli3 ZHAI Chaojiao1,2.Research on Safe Thickness of Overlying Rock Layer above Subway Tunnels in Upper-soft and Lower-hard Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 71-77
[10] WEN Xu1 PEI Xiangjun1 PEI Zuan1 YANG Hailong1 CHEN Zhenlin1 ZHANG Yichen2.Study on Structural Design and Safety of Shed Tunnels in the Scenic Area of Changbai Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 151-157
[11] WU Bo1,2 PENG Yiyong1,2 MENG Guowang1,2 PU Songquan3.Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 86-92
[12] HU Changming1,2 LI Liang1 MEI Yuan1,2 YUAN Yili1 WANG Zhiyu1.Global Sensitivity Analysis on Parameters of the Prediction Model for Shield Vertical Attitude[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 127-134
[13] GAO Xin WANG Wenjuan.Research on Reasonable Combination Forms and Mechanical Deformation Characteristics of Double-layer Superimposed Lining in Deep-buried Tunnels under the Action of Far-field Hydrostatic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 93-102
[14] YU Hongping1 SU Peidong2 ZHAO Tianbiao3 CHEN Dejun1 XU Xueyuan1 DU Yuben1.Study on Sources and Hazards of Crude Oil and Harmful Gases in Huangjialiang Tunnel on Xi′an-Chengdu Passenger Dedicated Line[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 182-187
[15] FAN Yanbo1, 2 CHEN Li3 SHI Jiangwei1, 2 DING Chu1, 2 ZHANG Xian1, 2.Study on Deformation Mechanism of the Underlying Tunnel Caused by Excavation of the Deep Foundation Pit in Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 103-110
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY