Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :166-173    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method
(Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100037)
Download: PDF (2637KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract For the subway station constructed with cut and cover top-down method, the vertical supporting system used during the construction is composed of the foundation pit supporting structure, intermediate column and pile foundation under the column, and the stability of the vertical supporting system is the key to the success of the project. Since the intermediate pile foundation bears the roof casingsoil, the dead weight of the roof and the intermediate floor structure, the road vehicle load and the construction load, etc., the selection, bearing capacity and settlement calculations of the intermediate pile foundation should be carried out according to the engineering geological conditions, the layout of the column network, the type of intermediate column and the construction requirements. Taking Zhongnan Road Station of Wuhan Metro as an example, comparison among four schemes of the pile foundation under column for the vertical support system of the station with cut and cover top-down method is conducted in this paper. By analyzing the bearing capacity, settlement, construction period and economic requirements of the intermediate pile foundation, it is finally decided to use the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile for construction. The pile test on the site, construction feedback, and deformation monitoring results show that the settlement of each pile top is no more than 3.7 mm and the ground settlement is 6.45 mm during construction after the technology of screw-drilled under-reamed hydraulically cast-in-situ pile is used, which can meet the settlement control requirements for pile body and surrounding buildings very well. Besides, with a lower cost and shortest construction period, the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile is the best one for Zhongnan Road Station of Wuhan Metro.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Liang
KeywordsCut and cover top-down method   Subway station   Vertical support system   Intermediate pile founda? tion   Screw-drilled under-reamed hydraulically cast-in-situ pile     
Abstract: For the subway station constructed with cut and cover top-down method, the vertical supporting system used during the construction is composed of the foundation pit supporting structure, intermediate column and pile foundation under the column, and the stability of the vertical supporting system is the key to the success of the project. Since the intermediate pile foundation bears the roof casingsoil, the dead weight of the roof and the intermediate floor structure, the road vehicle load and the construction load, etc., the selection, bearing capacity and settlement calculations of the intermediate pile foundation should be carried out according to the engineering geological conditions, the layout of the column network, the type of intermediate column and the construction requirements. Taking Zhongnan Road Station of Wuhan Metro as an example, comparison among four schemes of the pile foundation under column for the vertical support system of the station with cut and cover top-down method is conducted in this paper. By analyzing the bearing capacity, settlement, construction period and economic requirements of the intermediate pile foundation, it is finally decided to use the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile for construction. The pile test on the site, construction feedback, and deformation monitoring results show that the settlement of each pile top is no more than 3.7 mm and the ground settlement is 6.45 mm during construction after the technology of screw-drilled under-reamed hydraulically cast-in-situ pile is used, which can meet the settlement control requirements for pile body and surrounding buildings very well. Besides, with a lower cost and shortest construction period, the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile is the best one for Zhongnan Road Station of Wuhan Metro.
KeywordsCut and cover top-down method,   Subway station,   Vertical support system,   Intermediate pile founda? tion,   Screw-drilled under-reamed hydraulically cast-in-situ pile     
Cite this article:   
CHEN Liang .Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 166-173
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/166
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY