Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method
(Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100037)
Download: PDF (2637KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract For the subway station constructed with cut and cover top-down method, the vertical supporting system used during the construction is composed of the foundation pit supporting structure, intermediate column and pile foundation under the column, and the stability of the vertical supporting system is the key to the success of the project. Since the intermediate pile foundation bears the roof casingsoil, the dead weight of the roof and the intermediate floor structure, the road vehicle load and the construction load, etc., the selection, bearing capacity and settlement calculations of the intermediate pile foundation should be carried out according to the engineering geological conditions, the layout of the column network, the type of intermediate column and the construction requirements. Taking Zhongnan Road Station of Wuhan Metro as an example, comparison among four schemes of the pile foundation under column for the vertical support system of the station with cut and cover top-down method is conducted in this paper. By analyzing the bearing capacity, settlement, construction period and economic requirements of the intermediate pile foundation, it is finally decided to use the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile for construction. The pile test on the site, construction feedback, and deformation monitoring results show that the settlement of each pile top is no more than 3.7 mm and the ground settlement is 6.45 mm during construction after the technology of screw-drilled under-reamed hydraulically cast-in-situ pile is used, which can meet the settlement control requirements for pile body and surrounding buildings very well. Besides, with a lower cost and shortest construction period, the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile is the best one for Zhongnan Road Station of Wuhan Metro.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
CHEN Liang
KeywordsCut and cover top-down method   Subway station   Vertical support system   Intermediate pile founda? tion   Screw-drilled under-reamed hydraulically cast-in-situ pile     
Abstract: For the subway station constructed with cut and cover top-down method, the vertical supporting system used during the construction is composed of the foundation pit supporting structure, intermediate column and pile foundation under the column, and the stability of the vertical supporting system is the key to the success of the project. Since the intermediate pile foundation bears the roof casingsoil, the dead weight of the roof and the intermediate floor structure, the road vehicle load and the construction load, etc., the selection, bearing capacity and settlement calculations of the intermediate pile foundation should be carried out according to the engineering geological conditions, the layout of the column network, the type of intermediate column and the construction requirements. Taking Zhongnan Road Station of Wuhan Metro as an example, comparison among four schemes of the pile foundation under column for the vertical support system of the station with cut and cover top-down method is conducted in this paper. By analyzing the bearing capacity, settlement, construction period and economic requirements of the intermediate pile foundation, it is finally decided to use the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile for construction. The pile test on the site, construction feedback, and deformation monitoring results show that the settlement of each pile top is no more than 3.7 mm and the ground settlement is 6.45 mm during construction after the technology of screw-drilled under-reamed hydraulically cast-in-situ pile is used, which can meet the settlement control requirements for pile body and surrounding buildings very well. Besides, with a lower cost and shortest construction period, the scheme of screw-drilled under-reamed hydraulically cast-in-situ pile is the best one for Zhongnan Road Station of Wuhan Metro.
KeywordsCut and cover top-down method,   Subway station,   Vertical support system,   Intermediate pile founda? tion,   Screw-drilled under-reamed hydraulically cast-in-situ pile     
Cite this article:   
CHEN Liang .Study on Selection of the Intermediate Pile Foundation of Subway Stations with Cut and Cover Top-down Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 166-173
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/166
 
No references of article
[1] YU Jie.Study on Reasonable Construction Method for Tunnels in Contact Zone of Red Clay and Sandstone Interbedded with Mudstone[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 174-181
[2] WU Jiancheng.Research on Towing Issues of Immersed Tunnel Elements on Long-distance and Complex Route[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 145-150
[3] LEI Shengxiang1 WANG Fei2 YU Jie2 SHAO Shengjun3 LIANG Qingguo4.Discussion on the Technological Development of Loess Tunnelling in the Future[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 1-7
[4] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[5] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[6] GONG Qiuming1 WANG Qinghuan1 WANG Dujuan2 QIU Haifeng3 WU Fan.Development of a Real-time Monitoring System of Cutterhead Conditions in Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 41-50
[7] XU Xueliang1,2 MA Weibin1,2 CAI Degou1,2 AN Zheli1,2 CHAI Jinfei1,2.Research on Full-Life-Cycle Inspection and Monitoring System of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 31-40
[8] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[9] WANG Chunhe1,2 ZHU Fuqiang3 LUO Xing4 ZHANG Chuankui1,2 TIAN Junling3 LI Hepeng2 GUO Yifei4.Study on Construction Risk Assessment of Tunnel Reconstruction and Expansion Works[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 63-70
[10] ZHANG Ziguang1 CAO Guangyong1,2 LI Jianli3 ZHAI Chaojiao1,2.Research on Safe Thickness of Overlying Rock Layer above Subway Tunnels in Upper-soft and Lower-hard Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 71-77
[11] WEN Xu1 PEI Xiangjun1 PEI Zuan1 YANG Hailong1 CHEN Zhenlin1 ZHANG Yichen2.Study on Structural Design and Safety of Shed Tunnels in the Scenic Area of Changbai Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 151-157
[12] WU Bo1,2 PENG Yiyong1,2 MENG Guowang1,2 PU Songquan3.Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 86-92
[13] HU Changming1,2 LI Liang1 MEI Yuan1,2 YUAN Yili1 WANG Zhiyu1.Global Sensitivity Analysis on Parameters of the Prediction Model for Shield Vertical Attitude[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 127-134
[14] GAO Xin WANG Wenjuan.Research on Reasonable Combination Forms and Mechanical Deformation Characteristics of Double-layer Superimposed Lining in Deep-buried Tunnels under the Action of Far-field Hydrostatic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 93-102
[15] YU Hongping1 SU Peidong2 ZHAO Tianbiao3 CHEN Dejun1 XU Xueyuan1 DU Yuben1.Study on Sources and Hazards of Crude Oil and Harmful Gases in Huangjialiang Tunnel on Xi′an-Chengdu Passenger Dedicated Line[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 182-187
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY