Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (2) :214-219    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Engineering Characteristics of Tertiary Mudstone and Construction Technology of Inverted Arch
(1 Erchu Co., Ltd. of China Railway Tunnel Group, Langfang 065201; 2 China Railway Tunnel Group Co., Ltd., Guangzhou 511458)
Download: PDF (2520KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To solve the problem of softening and strength decrease of tertiary mudstone due to groundwater conver? gence and excavation disturbance during the inverted arch construction of a tunnel, the laboratory test is carried out by field sampling. The results show that the uniaxial compressive strength of the tertiary mudstone in the natural state is negative correlated with the water content, the uniaxial compressive strength of the mudstone in the saturated state is obviously reduced with obvious softening effect, and the bearing capacity of the foundation after softening cannot meet the design requirements. In view of this, the water flows in different paths are classified and collected to reduce their deterioration effect on the surrounding rocks during the construction. The measures such as backfilling of the base with gravels and grouting reinforcement can solve the problems of seepage channel and surrounding rocks softening due to excavation disturbance of inverted arch, and the problem of insufficient bearing capacity of foundation is also effectively solved through the grouting reinforcement in the later period. Moreover, the indepen? dent vertical and horizontal drainage systems are added in the water-rich sections, so that the water accumulated in the base of the inverted arch can be drained in time when the pressure condition is met, thus avoiding the possible basement diseases caused by bedrock softening due to the effect of groundwater after operation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Xianwei1 HONG Kairong2 CHANG Xiang2 CHEN Hong1
KeywordsRailway tunnel   Tertiary mudstone   Engineering characteristics   Base structure   Grouting reinforce? ment   Independent drainage     
Abstract: To solve the problem of softening and strength decrease of tertiary mudstone due to groundwater conver? gence and excavation disturbance during the inverted arch construction of a tunnel, the laboratory test is carried out by field sampling. The results show that the uniaxial compressive strength of the tertiary mudstone in the natural state is negative correlated with the water content, the uniaxial compressive strength of the mudstone in the saturated state is obviously reduced with obvious softening effect, and the bearing capacity of the foundation after softening cannot meet the design requirements. In view of this, the water flows in different paths are classified and collected to reduce their deterioration effect on the surrounding rocks during the construction. The measures such as backfilling of the base with gravels and grouting reinforcement can solve the problems of seepage channel and surrounding rocks softening due to excavation disturbance of inverted arch, and the problem of insufficient bearing capacity of foundation is also effectively solved through the grouting reinforcement in the later period. Moreover, the indepen? dent vertical and horizontal drainage systems are added in the water-rich sections, so that the water accumulated in the base of the inverted arch can be drained in time when the pressure condition is met, thus avoiding the possible basement diseases caused by bedrock softening due to the effect of groundwater after operation.
KeywordsRailway tunnel,   Tertiary mudstone,   Engineering characteristics,   Base structure,   Grouting reinforce? ment,   Independent drainage     
Cite this article:   
ZHANG Xianwei1 HONG Kairong2 CHANG Xiang2 CHEN Hong1 .Study on Engineering Characteristics of Tertiary Mudstone and Construction Technology of Inverted Arch[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(2): 214-219
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I2/214
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY