Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (3) :130-138    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on the Stress Characteristics of the Mid-pillar in the Expansion of an Existing Tunnel into a Double-arch Tunnel
(1 School of Highway, Chang′an University, Xi′an 710064; 2 Guangxi Key Lab of Road Structure and Materials, Nanning 530007;3 Guangxi Transportation Science and Technology Group Co., Ltd., Nanning 530007)
Download: PDF (5239KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As the core structural component of double-arch tunnels, the force condition of the mid-pillar is not only related to the safety of the tunnel structure during construction but also directly affects the long-term safety and stability of the tunnel structure during operation. This paper takes the expansion of an existing single-tube tunnel into a double-arch tunnel as an example and carries out the model test and numerical simulation to study the stress characteristics of the mid-pillar during the construction. The construction plan is excavating the right tube (first tube) followed by the left tube (second tube). The results of the model test show that after completion of the expansion construction, the left side of the curved top surface of the mid-pillar is under tension while the right side is under compression; the left and right sides of the shoulder of the mid-pillar are both under tension, and the tensile stress on the right side is 2.86 times that on the left side; the left and right sides of the waist of the mid-pillar are both under compression, and the compressive stress on the right side is 1.32 times that on the left side, which are basically consistent with the numerical simulation results; the compressive stress at the toe of the left side of the mid-pillar is greater than that of the right side, and the mid-pillar is subject to bias pressure toward the left side of the tube. The horizontal displacement of the mid-pillar moves firstly to the side of the second tube then to the side of the first tube, and finally to the side of the second tube.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
JIA Yanling1
2
3 ZHOU Shaowen2
3 WANG Gang2
3 ZHOU Weizheng2
3 YANG Kunguang2
3
KeywordsTunnel reconstruction and expansion   Multi-arch tunnel   Model test   Numerical analysis   Mid-pillar     
Abstract: As the core structural component of double-arch tunnels, the force condition of the mid-pillar is not only related to the safety of the tunnel structure during construction but also directly affects the long-term safety and stability of the tunnel structure during operation. This paper takes the expansion of an existing single-tube tunnel into a double-arch tunnel as an example and carries out the model test and numerical simulation to study the stress characteristics of the mid-pillar during the construction. The construction plan is excavating the right tube (first tube) followed by the left tube (second tube). The results of the model test show that after completion of the expansion construction, the left side of the curved top surface of the mid-pillar is under tension while the right side is under compression; the left and right sides of the shoulder of the mid-pillar are both under tension, and the tensile stress on the right side is 2.86 times that on the left side; the left and right sides of the waist of the mid-pillar are both under compression, and the compressive stress on the right side is 1.32 times that on the left side, which are basically consistent with the numerical simulation results; the compressive stress at the toe of the left side of the mid-pillar is greater than that of the right side, and the mid-pillar is subject to bias pressure toward the left side of the tube. The horizontal displacement of the mid-pillar moves firstly to the side of the second tube then to the side of the first tube, and finally to the side of the second tube.
KeywordsTunnel reconstruction and expansion,   Multi-arch tunnel,   Model test,   Numerical analysis,   Mid-pillar     
Cite this article:   
JIA Yanling1, 2, 3 ZHOU Shaowen2 etc .Study on the Stress Characteristics of the Mid-pillar in the Expansion of an Existing Tunnel into a Double-arch Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 130-138
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I3/130
 
No references of article
[1] LI Ruijun1 SONG Zongying2 LI Chen1 WANG Wenbin2 REN Yuzhen3,4 CAI Jianhua3,4 ZHANG Jiaxu3,4.Multi-source Data Fusion-based Diagnosis and Treatment Strategies for Tructural Defects in Liangjiashan Tunnel on Heavy-haul Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 301-308
[2] ZHANG Xiaolong.Mechanical Response Analysis of Subway Shield Tunnel Structure under Pile Foundation Load[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 82-89
[3] LI Kexi1,2 DANG Jiandong3 ZHANG Jian3 YE Guangxiang4 WANG Xiaojun1,2 CHEN Qinglin1,2.Study on Fracture Characteristics of Different Types of Sandstone Based on Acoustic Emission Characteristic Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 26-36
[4] ZHOU Cairong1 YI Liming1 MA Shanqing2 ZHOU Li3 YU Jinhong4, 5.Load-bearing Behavior and Reinforcement Schemes of High-performance Fiber-reinforced Concrete Jacking Pipes under Three-point Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 50-60
[5] GUO Yongjun1 LI Chao2 ZHENG Jianguo3 YU Yongtang4 ZHU Caihui5.Influence of Ground Surcharge on Existing Shield Tunnel Segments in Xi′an Loess Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 61-72
[6] WANG Yonggang1 CUI Yikun1 WU Jiuqi2, 3 HUANG Jun4 SHEN Xiang2, 3 YANG Kui4 SU Dong2, 3.Comparative Analysis of Disc Cutter Forces and Wear under Different Wear Modes[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 73-81
[7] FENG Jimeng1,2 SONG Jiadai1,2 WANG Shengtao3 LI Yifei1,2 ZHANG Junru1,2 WANG Haoming4 WANG Bo1,2.Study on the Deformation Control Effectiveness of Extra-long Pipe Roofs in Large-section Tunnels in Reclamation Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 155-162
[8] XU Caijian1 CHEN Xingyu1 LEI Minglin1 ZHANG Xinglong2 SUN Huaiyuan2 LI Xiaojun2.Digital Twin and Risk Decision-making for Water-richess of Surrounding Rock Ahead of Tunnel Face[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 90-99
[9] YANG Ying1 NI Kai1 GE Lin2 ZHANG Mingfei3 WANG Xiaorui4.Improved UNet Model-based Image Segmentation for Tunnel Seepage Defects under Low-light Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 100-110
[10] SU Kaichun1 FU Rui2,3 ZENG Hongrui2,3 LENG Xiqiao4 GUO Chun2,3.Short-term Multi-step Traffic Volume Prediction for Highway Tunnels Based on DBO-A-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 111-121
[11] XIONG Ying1,2 ZHANG Junru1,2 FAN Ziyan1,2 CHEN Jiahao1,2 MA Jianchi1,2 CHEN Pengtao1,2.Propagation and Attenuation Characteristics of Blast-induced Stress Waves in Layered Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 122-131
[12] LIU Yang1 SHAO Zekai2 TIAN Haofan2 ZHANG Ruxi1 ZHENG Bo3 WANG Zhengzheng2.Damage Mechanisms of Coal Pillars Induced by Blasting Construction in Highway Tunnels Underlying Room-and-Pillar Mine Goafs[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 132-144
[13] LUO Zhiyang1 ZHANG Chunyu2,3 WANG Lichuan1,2,4,5 XU Shuo1 LI Liping4 WANG Qianqian5 LIU Zhiqiang6.Research on Water Inrush Mechanisms and Grouting Sealing Techniques for TBM Tunnels in Fractured Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 145-154
[14] ZHOU Yili1 FENG Kun1 GUO Wenqi1 ZHANG Liangliang2 LI Chunlin3.Study on the Bending Behavior and Damage Characteristics of Longitudinal Segment Joints in Super-large Diameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 163-173
[15] YI Dan1 XUE Haoyun2 YANG Shaoyi2 YU Bo1 FENG Kun2 LIN Gang1.Analysis of the Influence of Bolt Failure of Shield Tunnel Segment Structure on Transverse Seismic Response[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 174-181
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY