Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (3) :147-153    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on the Optimization of Air Duct Outlet Position of Forced Ventilation in Plateau Spiral Tunnels
(1 School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074; 2 Guangxi Communications Design Group Co., Ltd.,Nanning 530000; 3 CCCC Infrastructure Maintenance Group Co., Ltd., Beijing 100011)
Download: PDF (3323KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To study the flow field characteristics of the forced ventilation in plateau spiral tunnels and the influ? ence of the layout parameters of air duct outlet position on the tunnel construction ventilation effect, this paper studies the flow field characteristics near the tunnel face based on the Wolonggou No.1 tunnel project, by using the Fluent software and taking into consideration two kinds of longitudinal gradients, three kinds of air duct diameters and seven kinds of air duct outlet distances and other factors. The results show that if the air duct outlet in forced ventilation is too close or too far away from the working face, it is not conducive to the ventilation efficiency, and the optimal air duct outlet positions for Wolonggou No.1 tunnel are obtained regarding different longitudinal gradients and different duct layout diameters, which are applied to the tunnel practice, and the reliability of the results is verified by field tests.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GAO Feng1 TANG Yuchen2 ZHANG Gensi3 LIU Lin3
KeywordsPlateau spiral tunnel   Forced ventilation   Numerical simulation   Air duct outlet position   Optimization     
Abstract: To study the flow field characteristics of the forced ventilation in plateau spiral tunnels and the influ? ence of the layout parameters of air duct outlet position on the tunnel construction ventilation effect, this paper studies the flow field characteristics near the tunnel face based on the Wolonggou No.1 tunnel project, by using the Fluent software and taking into consideration two kinds of longitudinal gradients, three kinds of air duct diameters and seven kinds of air duct outlet distances and other factors. The results show that if the air duct outlet in forced ventilation is too close or too far away from the working face, it is not conducive to the ventilation efficiency, and the optimal air duct outlet positions for Wolonggou No.1 tunnel are obtained regarding different longitudinal gradients and different duct layout diameters, which are applied to the tunnel practice, and the reliability of the results is verified by field tests.
KeywordsPlateau spiral tunnel,   Forced ventilation,   Numerical simulation,   Air duct outlet position,   Optimization     
Cite this article:   
GAO Feng1 TANG Yuchen2 ZHANG Gensi3 LIU Lin3 .Study on the Optimization of Air Duct Outlet Position of Forced Ventilation in Plateau Spiral Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 147-153
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I3/147
 
No references of article
[1] .[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 1-5
[2] ZHU Weibin1,2 ZHONG Changping3 MI Jinsheng1 HUANG Weiran4.Challenges and Prospects of Construction Technology for Extra-large Diameter Composite Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 6-16
[3] MA Shiqiang.Dialectical Thinking on Solving Major Issues in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 17-22
[4] ZHANG Jie1 LI Wei1 LI Limin2 WAN Jiwei3 DING Weihua4 JIA Chao1.Influence of Tectonic Characteristics of Surrounding Rocks on Engineering Geology of Water Conveyance Tunnel in the Hanjiang-to-Weihe River Valley Water Diversion Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 23-32
[5] HAN Xingbo1,2 ZHAO Weifeng1.Study on the Tunnel Lining Cracking Patterns and Failure Ranges under Fire Scenarios[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 33-42
[6] GAO Lei BAO Xueying LI Aichun.DSR-Cloud Model Based Evaluation of Construction Safety of Tunnels with High Geotemperature[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 43-51
[7] DENG Haiming1 YANG Xi2 LI Zhishan3 LEI Hongxian4 TANG Kan1 FAN Mingwai2 ZHANG Hantao2.A 3D GPR Imaging Technique of Tunnel Cavities Based on the Half-space Scanning Measurement Mode[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 52-59
[8] HE Lili.Implementation and Application of Tension-Shear Fracture of Anchor Bolts in FLAC3D[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 60-69
[9] ZHANG Xiaojian1 LIANG Bo1,2 ZHONG Shengming1,3.Study on the Influence of Environmental Factors on the Brightness Value L20(S) outside Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 70-78
[10] ZHANG Chang′an1 QI Xiangcheng2.Solutions to the Spherical Cavity Grouting Pressure in Circular Tunnels Based on the Generalized SMP Strength Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 79-83
[11] YAO Yuxiang1 LI Sheng1 MA Li1 WANG Changdan2 ZUO Di3.DEM Analysis on Soil Arching Effect of Unloading Structure of High-Filled Open Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 84-93
[12] HAN Guoqiang1 ZHOU Peng1 LI Sheng1 HE Chuan2 MA Li1.Research on the Calculation Method of Vertical Soil Pressure on High-Filled Open Cut Tunnels Based on Multi-factor Coupling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 94-99
[13] GAN Xingqiu1 XU Feng1 WANG Xiaowei1 LI Pei1 PENG Shuquan2 QI Binxi2 FAN Ling2 WANG Fan2.Simulation Study on Seismic Response Laws and Seismic Mitigation Measures of Tunnels under Fault Dislocation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 100-106
[14] YUAN Bin1 XU Fanxian2 LIAO Huan3 ZHONG Yutian3 LUO Gang3.Study on the Influence of the Spatial Combination Relationship of Structural Planes on the Stability of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 107-114
[15] AN Yonglin1 LI Jiahao1 OUYANG Pengbo2 LIU Wenjuan1 SU Guangming3 ZHOU Jian3.Theoretical Analysis of the Stability of Tunnel Face under Pipe Roof Presupport[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 115-122
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY