Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (3) :216-222    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
On the Causes and the Control Measures of the Tunnel Inverted Arch Heaving in Water-rich Coal Measure Strata
(1 School of Civil Engineering, Central South University, Changsha 410075; 2 School of Civil Engineering, Changsha University of Science & Technology, Changsha 410114)
Download: PDF (2915KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract When a tunnel in Guizhou passed through the coal measure strata with high water pressure during con? struction, it encountered the problem of the inverted arch heaving. This paper analyzes the causes of the tunnel inverted arch heaving through on-site observation and monitoring of the lining structure deformation, combined with numerical simulation. The results show that the rock softening at the base and high water pressure are the two main factors for the heaving of the tunnel inverted arch, and the former has a greater impact on the safety of the inverted arch structure. Combined with the engineering characteristics and the causes of the disease, comprehensive remediation measures are taken at the site, such as installing additional discharge holes at sidewalls, horizontal and vertical drain pipes to strengthen the drainage system and reduce the water pressure, installing perforated grouting pipes at the arch foot to strengthen the bedrock at the base and replacing the arch structure, etc., achieving good remediation results.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WAN Zheng1 ZHANG Xuemin1 FENG Han1 OU Xuefeng2 ZHOU Xianshun1
KeywordsHighway tunnel   Coal measure strata   Numerical calculation   Heave of inverted arch   High water pres? sure   Softening of surrounding rock   Remediation     
Abstract: When a tunnel in Guizhou passed through the coal measure strata with high water pressure during con? struction, it encountered the problem of the inverted arch heaving. This paper analyzes the causes of the tunnel inverted arch heaving through on-site observation and monitoring of the lining structure deformation, combined with numerical simulation. The results show that the rock softening at the base and high water pressure are the two main factors for the heaving of the tunnel inverted arch, and the former has a greater impact on the safety of the inverted arch structure. Combined with the engineering characteristics and the causes of the disease, comprehensive remediation measures are taken at the site, such as installing additional discharge holes at sidewalls, horizontal and vertical drain pipes to strengthen the drainage system and reduce the water pressure, installing perforated grouting pipes at the arch foot to strengthen the bedrock at the base and replacing the arch structure, etc., achieving good remediation results.
KeywordsHighway tunnel,   Coal measure strata,   Numerical calculation,   Heave of inverted arch,   High water pres? sure,   Softening of surrounding rock,   Remediation     
Cite this article:   
WAN Zheng1 ZHANG Xuemin1 FENG Han1 OU Xuefeng2 ZHOU Xianshun1 .On the Causes and the Control Measures of the Tunnel Inverted Arch Heaving in Water-rich Coal Measure Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(3): 216-222
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I3/216
 
No references of article
[1] .[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 1-5
[2] ZHU Weibin1,2 ZHONG Changping3 MI Jinsheng1 HUANG Weiran4.Challenges and Prospects of Construction Technology for Extra-large Diameter Composite Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 6-16
[3] MA Shiqiang.Dialectical Thinking on Solving Major Issues in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 17-22
[4] ZHANG Jie1 LI Wei1 LI Limin2 WAN Jiwei3 DING Weihua4 JIA Chao1.Influence of Tectonic Characteristics of Surrounding Rocks on Engineering Geology of Water Conveyance Tunnel in the Hanjiang-to-Weihe River Valley Water Diversion Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 23-32
[5] HAN Xingbo1,2 ZHAO Weifeng1.Study on the Tunnel Lining Cracking Patterns and Failure Ranges under Fire Scenarios[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 33-42
[6] GAO Lei BAO Xueying LI Aichun.DSR-Cloud Model Based Evaluation of Construction Safety of Tunnels with High Geotemperature[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 43-51
[7] DENG Haiming1 YANG Xi2 LI Zhishan3 LEI Hongxian4 TANG Kan1 FAN Mingwai2 ZHANG Hantao2.A 3D GPR Imaging Technique of Tunnel Cavities Based on the Half-space Scanning Measurement Mode[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 52-59
[8] HE Lili.Implementation and Application of Tension-Shear Fracture of Anchor Bolts in FLAC3D[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 60-69
[9] ZHANG Xiaojian1 LIANG Bo1,2 ZHONG Shengming1,3.Study on the Influence of Environmental Factors on the Brightness Value L20(S) outside Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 70-78
[10] ZHANG Chang′an1 QI Xiangcheng2.Solutions to the Spherical Cavity Grouting Pressure in Circular Tunnels Based on the Generalized SMP Strength Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 79-83
[11] YAO Yuxiang1 LI Sheng1 MA Li1 WANG Changdan2 ZUO Di3.DEM Analysis on Soil Arching Effect of Unloading Structure of High-Filled Open Cut Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 84-93
[12] HAN Guoqiang1 ZHOU Peng1 LI Sheng1 HE Chuan2 MA Li1.Research on the Calculation Method of Vertical Soil Pressure on High-Filled Open Cut Tunnels Based on Multi-factor Coupling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 94-99
[13] GAN Xingqiu1 XU Feng1 WANG Xiaowei1 LI Pei1 PENG Shuquan2 QI Binxi2 FAN Ling2 WANG Fan2.Simulation Study on Seismic Response Laws and Seismic Mitigation Measures of Tunnels under Fault Dislocation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 100-106
[14] YUAN Bin1 XU Fanxian2 LIAO Huan3 ZHONG Yutian3 LUO Gang3.Study on the Influence of the Spatial Combination Relationship of Structural Planes on the Stability of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 107-114
[15] AN Yonglin1 LI Jiahao1 OUYANG Pengbo2 LIU Wenjuan1 SU Guangming3 ZHOU Jian3.Theoretical Analysis of the Stability of Tunnel Face under Pipe Roof Presupport[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 115-122
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY