Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (4) :57-66    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method
(School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070)
Download: PDF (4909KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In order to assess the safety risk of a subway connecting passage constructed by freezing method, based on relevant references, existing project experience and similar project records, this paper identifies major risk factors in the four construction stages of a subway connecting passage by freezing method, establishes an evaluation indicator system, and proposes a safety risk assessment method for a subway connecting passage constructed by freezing method based on analytic hierarchy process (AHP), fuzzy comprehensive evaluation (FCE) and Bayesian network(BN). Firstly, it uses AHP to calculate the relative weights of various risk events, uses the risk-related economic loss value to describe the impact consequences of risk events, and uses BN to calculate the probability rating scores of risk events. Secondly, combining the risk-related economic loss value with probability rating score, it uses the trapezoidal membership function to calculate the membership of risk event to risk level, conducts the fuzzy comprehensive operation for the weight of risk event and the membership of risk event to risk level, and obtains the overall risk level of a connecting passage constructed by freezing method. Finally, taking Lanzhou Metro Line 1 as an example, the assessed overall risk level of the project is low risk, basically reflecting the actual situation.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHAI Qiang GU Weihong JIN Zhaoqin
KeywordsConnecting passage   Freezing method   Construction risk   Analytic hierarchy process (AHP)   Risk-re? lated economic loss value   Risk probability rating score   Fuzzy comprehensive evaluation (FCE)     
Abstract: In order to assess the safety risk of a subway connecting passage constructed by freezing method, based on relevant references, existing project experience and similar project records, this paper identifies major risk factors in the four construction stages of a subway connecting passage by freezing method, establishes an evaluation indicator system, and proposes a safety risk assessment method for a subway connecting passage constructed by freezing method based on analytic hierarchy process (AHP), fuzzy comprehensive evaluation (FCE) and Bayesian network(BN). Firstly, it uses AHP to calculate the relative weights of various risk events, uses the risk-related economic loss value to describe the impact consequences of risk events, and uses BN to calculate the probability rating scores of risk events. Secondly, combining the risk-related economic loss value with probability rating score, it uses the trapezoidal membership function to calculate the membership of risk event to risk level, conducts the fuzzy comprehensive operation for the weight of risk event and the membership of risk event to risk level, and obtains the overall risk level of a connecting passage constructed by freezing method. Finally, taking Lanzhou Metro Line 1 as an example, the assessed overall risk level of the project is low risk, basically reflecting the actual situation.
KeywordsConnecting passage,   Freezing method,   Construction risk,   Analytic hierarchy process (AHP),   Risk-re? lated economic loss value,   Risk probability rating score,   Fuzzy comprehensive evaluation (FCE)     
Cite this article:   
ZHAI Qiang GU Weihong JIN Zhaoqin .Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 57-66
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/57
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[8] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[9] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[10] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[11] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[12] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[13] WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2.Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 117-124
[14] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
[15] YAN Haojie ZHENG Junjie PAN Yu CHEN Pengfei.Time-Space Effect of Pile Foundation Responses Induced by Adjacent Shield Tunnel Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 133-140
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY