Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass
(1 College of Water & Architectural Engineering, Shihezi University, Shihezi 832003; 2 Xinjiang Survey and Design Institute of Water Resource and Hydropower, Urumqi 830099)
Download: PDF (2546KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The deep-buried high-geostress hydraulic tunnel is located in a complicated geomechanical environ? ment, and the distribution and evolution laws of plastic zone of surrounding rock during excavation are key to controlling tunnel stability. In order to reveal the characteristics and distribution laws of plastic zone during excavation of hydraulic tunnels with high-geostress, this paper combines theoretical analysis with numerical simulation, derives a calculation formula of plastic zone range, introduces a new dimensionless parameter to evaluate the plastic zone of surrounding rock in a non-circular tunnel, and analyzes the influences of lateral pressure coefficient and excavation disturbance on the plastic zone of jointed rock mass with high geostress. The study result shows that the axial development range of rock plastic zone affected by excavation disturbance is about 1.0-1.5 times the tunnel diameter, while the influence range can be 2 times the tunnel diameter for the rock mass with joint plane. It is concluded that the lateral pressure coefficient directly affects the shape of the plastic zone of the surrounding rock, with the tendency of irregular development of the rock plastic zone along the joint plane. The greater the difference between the horizontal stress and vertical stress is, the greater the influence range of the joint plane on the plastic zone of the surrounding rock will be. In addition, the joint plane can prevent the plastic zone from development along the vertical joint plane.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HUI Qiang1 ZHANG Jun2 JIANG Haibo1
KeywordsDeep-buried tunnel   Distribution of plastic zone   Numerical simulation   Jointed rock mass   Excavation disturbance   High geostress     
Abstract: The deep-buried high-geostress hydraulic tunnel is located in a complicated geomechanical environ? ment, and the distribution and evolution laws of plastic zone of surrounding rock during excavation are key to controlling tunnel stability. In order to reveal the characteristics and distribution laws of plastic zone during excavation of hydraulic tunnels with high-geostress, this paper combines theoretical analysis with numerical simulation, derives a calculation formula of plastic zone range, introduces a new dimensionless parameter to evaluate the plastic zone of surrounding rock in a non-circular tunnel, and analyzes the influences of lateral pressure coefficient and excavation disturbance on the plastic zone of jointed rock mass with high geostress. The study result shows that the axial development range of rock plastic zone affected by excavation disturbance is about 1.0-1.5 times the tunnel diameter, while the influence range can be 2 times the tunnel diameter for the rock mass with joint plane. It is concluded that the lateral pressure coefficient directly affects the shape of the plastic zone of the surrounding rock, with the tendency of irregular development of the rock plastic zone along the joint plane. The greater the difference between the horizontal stress and vertical stress is, the greater the influence range of the joint plane on the plastic zone of the surrounding rock will be. In addition, the joint plane can prevent the plastic zone from development along the vertical joint plane.
KeywordsDeep-buried tunnel,   Distribution of plastic zone,   Numerical simulation,   Jointed rock mass,   Excavation disturbance,   High geostress     
Cite this article:   
HUI Qiang1 ZHANG Jun2 JIANG Haibo1 .Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 86-94
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/86
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[8] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[9] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[10] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[11] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[12] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[13] WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2.Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 117-124
[14] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
[15] YAN Haojie ZHENG Junjie PAN Yu CHEN Pengfei.Time-Space Effect of Pile Foundation Responses Induced by Adjacent Shield Tunnel Excavation[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 133-140
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY