MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (4) :237-245    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on the Detection and Treatment Technology for Highway Tunnel Defects
(Guizhou Transportation Planning Survey & Design Academe Co., Ltd., Guiyang 550081)
Download: PDF (6449KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The problem of highway tunnel defects has become an unavoidable factor that affects traffic safety. Based on the context of Jizhao tunnel on Xiamen-Chengdu expressway, this paper conducts tests on the lining concrete strength, tunnel inner contour condition in terms of various tunnel defects, such as lining cracking, cable groove sinking and sidewall seepage, analyzes the causes of tunnel defects based on the testing results, and proposes reasonable treatment options: (1) using the foot-locking and grouting perforated steel pipes, and installing additional plain concrete inverted arch or reinforced concrete invert arch to effectively improve the stability of the tunnel structure; (2) setting up transverse drainage pipes in the additional inverted arch section in combination with longitudinal drainage pipes to ensure smooth drainage; (3) re-pouring the secondary lining sidewalls with severe deformation,cracking and spalling, in combination with installation of low pre-stressed anchor bolts and steel strips to anchor the secondary lining and the surrounding rock as a whole. These methods can provide certain references for treating the defects of existing tunnels.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YANG Chunping HU Qiang
Keywordsunnel engineering   Defect treatment   Defect detection   Lining cracking   Jizhao tunnel     
Abstract: The problem of highway tunnel defects has become an unavoidable factor that affects traffic safety. Based on the context of Jizhao tunnel on Xiamen-Chengdu expressway, this paper conducts tests on the lining concrete strength, tunnel inner contour condition in terms of various tunnel defects, such as lining cracking, cable groove sinking and sidewall seepage, analyzes the causes of tunnel defects based on the testing results, and proposes reasonable treatment options: (1) using the foot-locking and grouting perforated steel pipes, and installing additional plain concrete inverted arch or reinforced concrete invert arch to effectively improve the stability of the tunnel structure; (2) setting up transverse drainage pipes in the additional inverted arch section in combination with longitudinal drainage pipes to ensure smooth drainage; (3) re-pouring the secondary lining sidewalls with severe deformation,cracking and spalling, in combination with installation of low pre-stressed anchor bolts and steel strips to anchor the secondary lining and the surrounding rock as a whole. These methods can provide certain references for treating the defects of existing tunnels.
Keywordsunnel engineering,   Defect treatment,   Defect detection,   Lining cracking,   Jizhao tunnel     
Cite this article:   
YANG Chunping HU Qiang .Research on the Detection and Treatment Technology for Highway Tunnel Defects[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 237-245
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/237
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[8] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[9] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[10] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[11] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[12] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[13] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[14] WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2.Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 117-124
[15] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY