Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (5) :56-64    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station
(China Railway Liuyuan Group Co., Ltd., Tianjin 300308)
Download: PDF (4931KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Double shield TBM has been widely used in urban rail transit projects for its advantages of safe, effi? cient and fast construction, and a reasonable routing for TBM passing through the station is also one of the key technologies for TBM tunnel construction. Based on the equipment models and station-crossing methods commonly used for double shield TBM construction in Qingdao, this paper conducts a thorough research and analysis on the different TBM station-crossing methods, the relationship between routes and construction clearances, furthermore assesses the construction risks for tunnels with small clear distance. The conclusions are drawn as follows: (1) the engineering cost performance is the highest when priority is given to the method of whole TBM machine curved passing through the station, and the crossing route is two section of reverse curves tangent to each other, with equal radius and the radius of R=350 m; (2) when the TBM passing through the station installed with the secondary lining, the construction clearance of the mined approach tunnel is the same, and the deflection route length increases with the increase of the deflection radius; (3) when the TBM passing through the station installed with the initial support, the length and construction clearance of the mined approach tunnel decrease with the increase of the sidewall thickness, and when the sidewall thickness is close to 1.15 m, priority should be given to the method of whole TBM machine straight passing through the station; (4) taking the common medium-weathered and slightly weathered strata in TBM tunnelling as examples, the plastic zone of the rock pillar sandwiched by the mined approach tunnels is not yet connected, and the horizontal convergence is small, so the construction risk of tunnels with small clear distance can be controlled, and the construction safety can be achieved; (5) it is recommended that priority be given to the method of TBM passing through the station install with the secondary lining, with strict control of the posture and direction of the TBM in the reverse curve section, timely and reasonable correction of the deflection, and ensuring the safety margin reserved between the cutter head and the structure.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi
KeywordsDouble shield TBM   Station-crossing method   Routing   Construction clearance   Risk assessment     
Abstract: Double shield TBM has been widely used in urban rail transit projects for its advantages of safe, effi? cient and fast construction, and a reasonable routing for TBM passing through the station is also one of the key technologies for TBM tunnel construction. Based on the equipment models and station-crossing methods commonly used for double shield TBM construction in Qingdao, this paper conducts a thorough research and analysis on the different TBM station-crossing methods, the relationship between routes and construction clearances, furthermore assesses the construction risks for tunnels with small clear distance. The conclusions are drawn as follows: (1) the engineering cost performance is the highest when priority is given to the method of whole TBM machine curved passing through the station, and the crossing route is two section of reverse curves tangent to each other, with equal radius and the radius of R=350 m; (2) when the TBM passing through the station installed with the secondary lining, the construction clearance of the mined approach tunnel is the same, and the deflection route length increases with the increase of the deflection radius; (3) when the TBM passing through the station installed with the initial support, the length and construction clearance of the mined approach tunnel decrease with the increase of the sidewall thickness, and when the sidewall thickness is close to 1.15 m, priority should be given to the method of whole TBM machine straight passing through the station; (4) taking the common medium-weathered and slightly weathered strata in TBM tunnelling as examples, the plastic zone of the rock pillar sandwiched by the mined approach tunnels is not yet connected, and the horizontal convergence is small, so the construction risk of tunnels with small clear distance can be controlled, and the construction safety can be achieved; (5) it is recommended that priority be given to the method of TBM passing through the station install with the secondary lining, with strict control of the posture and direction of the TBM in the reverse curve section, timely and reasonable correction of the deflection, and ensuring the safety margin reserved between the cutter head and the structure.
KeywordsDouble shield TBM,   Station-crossing method,   Routing,   Construction clearance,   Risk assessment     
Cite this article:   
GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi .Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(5): 56-64
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I5/56
 
No references of article
[1] WEI Gang1,2 ZHAO Deqianlin1 HUANG Rui1.A Review of Model Test Studies on the Impact of Shield Construction on Adjacent Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 1-8
[2] DING Zhi1,2 HE Chenyang1 ZHANG Xiao1 ZHANG Wenhong3 WU Sheng4.An Outlook for Researches on the Impact and Control Technology of Shield Construction in Gassy Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 9-20
[3] ZHANG Longguan1 LIU Suimei1 LI Kaifu1 XU Jin2,3,4 WANG Shengnan3,5 LI Qiang3.Prediction of Shield Construction Risks in Subway Tunnelling Based on Fault Tree and Bayesian Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 21-29
[4] ZHENG Bo1,2 WU Jian1,2 ZHENG Jinlong3 KUANG Liang4 GUO Rui1,2.Study on Anti-Freezing Parameters of High-Altitude Tunnels in Western Sichuan Based on Field Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 30-36
[5] QIU Wenge WAN Shifu GAO Ganggang ZHAO Hailin QI Xingxin.tudy on the Control Measures against Ground Settlement Induced by Shield Tunnel Construction underneath Railway Throat in Sandy Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 37-45
[6] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[7] LI Siming1 YU Haitao2 XUE Guangqiao3 XU Lei4.Analysis on Seismic Response of Shield Tunnels Passing Through Soil-Rock Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 65-72
[8] CHANG Gang1,2 PAI Lifang3,4 PANG Weijun1,4 WU Honggang1,2,4 YAN Lizhen1.Study on the Effect on Deformation of the Surrounding Rock Induced by DeepBuried Tunnelling under Hard Rock Combination Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 73-77
[9] CHEN Yukun1 GUAN Huisheng1 ZHOU Lei2 LIU Cheng1.Research on the Wear Prediction of Disc Cutters Based on BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 78-84
[10] SONG Yang1 WANG Weiyi2 DU Chunsheng3.On Parameter Optimization for a Slurry Shield Approaching Construction under Existing Subway Tunnels in Water-Rich Pebble and Mudstone Composite Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 85-95
[11] XU Youjun1,2 HUANG Zhengdong1,2 ZHANG Xu1,2 ZHANG Chao1,2 KANG Jiawang1,2 ZHOU Wei1.Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 96-103
[12] PAN Weiqiang1 JIAO Bochang2 LIU Xian2 ZENG Hua3 JI Maojie3.Field Test Research on the Contact Pressure and Stress Characteristics of Jacked Steel Pipes with Deep-buried Depth and Large-section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 104-113
[13] CHEN Zhiying NIU Guoqing WANG Shumeng GUO Chenwei.Study of the Optimization of Air Curtain Parameters in Tunnelling Based on Orthogonal Simulation Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 114-121
[14] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
[15] GUO Rui1, 2,3 ZHENG Bo2, 3 FANG Lin1, 4 WU Jian2, 3.Model Test Study on Distribution Characteristics of Longitudinal Temperature Field in Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 129-139
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY