Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method
(1 National Demonstration Center for Experimental Civil Engineering Education, Lanzhou Jiaotong University, Lanzhou 730070;2 School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 730070; 3 Nantong Urban Rail Transit Co., Ltd., Nantong 226000)
Download: PDF (3042KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As a new construction method of metro stations, the Pile-Beam-Arch method (PBA) has been success? fully applied in the practical engineering, but there is a lack of comprehensive researches on the surface settlement and structural stress of metro stations caused by PBA method construction. Taking a metro station constructed by Pile-Beam-Arch (PBA) method as the engineering background, this paper analyzes the surface settlement and the structural stress of the metro station in different construction stages of PBA top-down construction method, by means of the combination of numerical simulation with on-site monitoring. The research results show that the excavation of the pilot tunnel and the construction of the supporting arch have great disturbance to the ground, it is necessary to pre-reinforce the ground (such as advance pipe-roof + grouting), so as to strictly control the total amount of ground settlement. The time-history curve of the axial force of retaining piles can be divided into three stages: rapid growth stage, slow growth stage, and stable stage. The variation laws of measured and the calculated settlements are basically consistent, and both the measured and calculated maximum surface settlement occur above the central axis of the station, which is in line with the Peck settlement trough theory.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHOU Wendi1
2 LIANG Qingguo1
2 ZHANG Jindong3
KeywordsMetro station   PBA method   Surface settlement   Structural stress   Numerical simulation   On-site moni? toring     
Abstract: As a new construction method of metro stations, the Pile-Beam-Arch method (PBA) has been success? fully applied in the practical engineering, but there is a lack of comprehensive researches on the surface settlement and structural stress of metro stations caused by PBA method construction. Taking a metro station constructed by Pile-Beam-Arch (PBA) method as the engineering background, this paper analyzes the surface settlement and the structural stress of the metro station in different construction stages of PBA top-down construction method, by means of the combination of numerical simulation with on-site monitoring. The research results show that the excavation of the pilot tunnel and the construction of the supporting arch have great disturbance to the ground, it is necessary to pre-reinforce the ground (such as advance pipe-roof + grouting), so as to strictly control the total amount of ground settlement. The time-history curve of the axial force of retaining piles can be divided into three stages: rapid growth stage, slow growth stage, and stable stage. The variation laws of measured and the calculated settlements are basically consistent, and both the measured and calculated maximum surface settlement occur above the central axis of the station, which is in line with the Peck settlement trough theory.
KeywordsMetro station,   PBA method,   Surface settlement,   Structural stress,   Numerical simulation,   On-site moni? toring     
Cite this article:   
ZHOU Wendi1, 2 LIANG Qingguo1, 2 ZHANG Jindong3 .Analysis of the Deformation and Structural Stress of a Metro Station Constructed by Pile-Beam-Arch Method[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 121-128
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I6/121
 
No references of article
[1] FENG Jimeng1,2 JIANG Hui1,2 DING Xiaoqi1,2 YU Longping1,2 ZHANG Junru1,2.Progresses and Challenges in Research on Parallel Double-tube Tunnels Crossing Landslides[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 1-10
[2] LU Guannan1 WANG Peng1 YANG Yun2 MAO Chengjun3 WU Yongjing4 WU Jianfeng3.Review of Researches on Groundwater Seepage Induced Crystallization and Blockage Mechanism and Scale Inhibition Technology in the Tunnel Drainage System in Karst Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 11-20
[3] DONG Jiansong.Construction Technology of Xiamen Haicang Subsea Tunnel Crossing Weathered Trough[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 197-203
[4] FU Lei MA Xin SHAO Wei.Effect of Cold Water Mixing Modes on Prediction of High Geo-temperature Induced Heat Hazards in Tunnelling in South Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 21-30
[5] HUA Xiaoming LUO Chenxi GOU Xiaojun ZHANG Haichao.Analysis on Land Surface Geothermal Spatial Distribution Characteristics of Long and Deep Tunnels Based on Landsat 8 Remote Sensing Images: A Case Study of Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 31-37
[6] WANG Mingnian1,2 CUI Peng1,2 YU Li1,2 LU Xudong3 HU Xiaoyue1,2 XIA Pengxi1,2.Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 38-45
[7] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[8] HE Leping1 XU Yingdong1 HU Qijun1 CAI Qijie2.Assessment of Large Deformation Risk in Soft Rock Tunnels Based on Game Theory - Cloud Model[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 85-94
[9] HAO Junsuo.Study on Key Intelligent Construction Technologies of Super-long and Deepburied Hydraulic Tunnels under Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 188-196
[10] WEI Gang1 HAO Wei2 WEI Xinjiang1 WANG Xiao2 ZHANG Shuyuan2.Numerical Simulation Study on Whole Construction Process of Vertical Pipe Jacking[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 59-67
[11] XIAO Zunqun1,2,3 CAO Tongtong1 XU Caiyun1 YANG Kai2 DONG Qiongying1 JIANG Yinan1.Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 68-76
[12] XU Gongyun1 XU Wanghao1,2 YAO Zhigang1 FANG Yong1 LIU Sijin3.Analysis on Influence of Penetration Angle on Disc Cutter Impact Based on Three-dimensional RBD-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 77-84
[13] LAI Hongpeng1 WANG Bin1 LIU Yuyang2.A Calculation Method of Surrounding Rock Pressure of Shallow-buried Loess Tunnels under Considering Ground Cracking[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 95-101
[14] ZHANG Dongmei1,2 CHEN Congcen2.Time-dependent Reliability Analysis of Shield Tunnel Structure under Corrosion Conditions of Segment Rebars and Bolts[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 111-120
[15] HUANG Diwen HUO Hongbin CHEN Dong.Analysis on Shear Deformation in a Circular Tunnel Based on Optimized Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 102-110
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY