Influence of High-performance Synchronous Grouting Material on Shield Construction Parameters in Water-rich Sand Layer
(1 School of Engineering (Wuhan), China University of Geosciences, Wuhan 430074; 2 China Academy of Building Research Co., Ltd., Beijing 100013; 3 JSTI Group Co., Ltd., Nanjing 210000; 4 Nantong Urban Rail Transit Co., Ltd., Nantong 226000)
Download: PDF (2961KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract A high-performance shield grouting material suitable for water-rich sand layer is prepared on the basis of the engineering background of Nantong Rail Transit Line 1 in water-rich sand layer. Then, comparative study is performed for the grouting performances of the prepared high-performance grouting material and existing grout used on the site as well as their influence law on shield construction parameters. The results show that: compared with the lot section used with existing grouts, the shield machine in the test section used with high-performance synchronous grouting material has the following properties: the soil chamber pressure increases from 0.22 MPa to 0.25 MPa, the average thrust increases from 12 000 kN to 15 000 kN, the cutter head torque increases from 1 150 kN·m to 1 450kN·m, the grouting amount decreases from 5.7 m3 to 5.2 m3 and the surface settlement is only 8.15 mm, so that the material cost is significantly reduced and the surface settlement could be effectively controlled. Furthermore, the relationship among key construction parameters of the shield is analyzed to find that the continuous reduction of grouting volume might have a certain impact on the soil chamber pressure, thrust and torque of the shield machine; when the shield machine drives at a constant speed, the variation laws of the curves of the soil chamber pressure, shield thrust and torque are consistent.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GAO Pengpeng1 XU Fang1 SONG Putao2 WANG Ningning3 ZHANG Wei4
KeywordsShield construction   High-performance synchronous grouting material   Water-rich sand layer   Con? struction parameters     
Abstract: A high-performance shield grouting material suitable for water-rich sand layer is prepared on the basis of the engineering background of Nantong Rail Transit Line 1 in water-rich sand layer. Then, comparative study is performed for the grouting performances of the prepared high-performance grouting material and existing grout used on the site as well as their influence law on shield construction parameters. The results show that: compared with the lot section used with existing grouts, the shield machine in the test section used with high-performance synchronous grouting material has the following properties: the soil chamber pressure increases from 0.22 MPa to 0.25 MPa, the average thrust increases from 12 000 kN to 15 000 kN, the cutter head torque increases from 1 150 kN·m to 1 450kN·m, the grouting amount decreases from 5.7 m3 to 5.2 m3 and the surface settlement is only 8.15 mm, so that the material cost is significantly reduced and the surface settlement could be effectively controlled. Furthermore, the relationship among key construction parameters of the shield is analyzed to find that the continuous reduction of grouting volume might have a certain impact on the soil chamber pressure, thrust and torque of the shield machine; when the shield machine drives at a constant speed, the variation laws of the curves of the soil chamber pressure, shield thrust and torque are consistent.
KeywordsShield construction,   High-performance synchronous grouting material,   Water-rich sand layer,   Con? struction parameters     
Cite this article:   
GAO Pengpeng1 XU Fang1 SONG Putao2 WANG Ningning3 ZHANG Wei4 .Influence of High-performance Synchronous Grouting Material on Shield Construction Parameters in Water-rich Sand Layer[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(6): 244-250
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I6/244
 
No references of article
[1] FENG Jimeng1,2 JIANG Hui1,2 DING Xiaoqi1,2 YU Longping1,2 ZHANG Junru1,2.Progresses and Challenges in Research on Parallel Double-tube Tunnels Crossing Landslides[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 1-10
[2] LU Guannan1 WANG Peng1 YANG Yun2 MAO Chengjun3 WU Yongjing4 WU Jianfeng3.Review of Researches on Groundwater Seepage Induced Crystallization and Blockage Mechanism and Scale Inhibition Technology in the Tunnel Drainage System in Karst Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 11-20
[3] DONG Jiansong.Construction Technology of Xiamen Haicang Subsea Tunnel Crossing Weathered Trough[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 197-203
[4] FU Lei MA Xin SHAO Wei.Effect of Cold Water Mixing Modes on Prediction of High Geo-temperature Induced Heat Hazards in Tunnelling in South Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 21-30
[5] HUA Xiaoming LUO Chenxi GOU Xiaojun ZHANG Haichao.Analysis on Land Surface Geothermal Spatial Distribution Characteristics of Long and Deep Tunnels Based on Landsat 8 Remote Sensing Images: A Case Study of Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 31-37
[6] WANG Mingnian1,2 CUI Peng1,2 YU Li1,2 LU Xudong3 HU Xiaoyue1,2 XIA Pengxi1,2.Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 38-45
[7] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[8] HE Leping1 XU Yingdong1 HU Qijun1 CAI Qijie2.Assessment of Large Deformation Risk in Soft Rock Tunnels Based on Game Theory - Cloud Model[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 85-94
[9] HAO Junsuo.Study on Key Intelligent Construction Technologies of Super-long and Deepburied Hydraulic Tunnels under Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 188-196
[10] WEI Gang1 HAO Wei2 WEI Xinjiang1 WANG Xiao2 ZHANG Shuyuan2.Numerical Simulation Study on Whole Construction Process of Vertical Pipe Jacking[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 59-67
[11] XIAO Zunqun1,2,3 CAO Tongtong1 XU Caiyun1 YANG Kai2 DONG Qiongying1 JIANG Yinan1.Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 68-76
[12] XU Gongyun1 XU Wanghao1,2 YAO Zhigang1 FANG Yong1 LIU Sijin3.Analysis on Influence of Penetration Angle on Disc Cutter Impact Based on Three-dimensional RBD-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 77-84
[13] LAI Hongpeng1 WANG Bin1 LIU Yuyang2.A Calculation Method of Surrounding Rock Pressure of Shallow-buried Loess Tunnels under Considering Ground Cracking[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 95-101
[14] ZHANG Dongmei1,2 CHEN Congcen2.Time-dependent Reliability Analysis of Shield Tunnel Structure under Corrosion Conditions of Segment Rebars and Bolts[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 111-120
[15] HUANG Diwen HUO Hongbin CHEN Dong.Analysis on Shear Deformation in a Circular Tunnel Based on Optimized Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 102-110
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY