General Construction Technology Scheme of Tianshan Shengli Tunnel on Urumqi-Yuli Expressway
(1. CCCC Second Highway Engineering Bureau Co., Ltd., Xi′an 710065; 2. CCCC Second Highway Engineering Bureau Dongmeng Engineering Co., Ltd., Xi′an 710000)
Download: PDF (8727KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With a total length of about 22 km, Tianshan Shengli Tunnel on Urumqi-Yuli Expressway is currently the longest expressway tunnel under construction in the world. It adopts the construction scheme of "3 tunnels (2 D&B main tunnels and 1 TBM-driven middle pilot tunnel) + 4 shafts", which is characterized by great construction difficulty and high technical standard requirements. The tunnel construction is faced with technical challenges such as TBM passing through large fault fracture zones, long-distance construction ventilation in three tunnels, deep and large shaft construction and logistics organization in two-main tunnel construction assisted by middle pilot tunnel.In the parallel three-tunnel method design of Tianshan Shengli Tunnel, the TBM-driven middle pilot tunnel can not only play the role of advanced pilot tunnel, but also assist the construction of the two main tunnels and speed up the construction progress. For the middle pilot tunnel, the TBM excavation diameter is 8.4 m, and the initial support is designed as 100% force-bearing capacity in construction period, which can meet the requirements for two-way material transportation, ventilation and belt mucking in the pilot tunnel. Vault suspension scheme is adopted for the continuous belt conveyor, which can reduce the impact on the material flow organization in the cross passages. Multifunctional service vehicles (MSVs) independently developed by CCCC Group are used for the transportation of TBM materials and prefabricated inverted arch blocks, which can realize double-headed driving. TBM will pass through two large fault fracture zones F6 and F7. According to the stability of the surrounding rock at the tunnel face, the targeted treatment measures would be adopted. If necessary, the scheme of "steel segment + extruded concrete" shall be used for the initial support. In case of serious machine jamming or rock collapse, the heading expansion excavation method or bypass heading method shall be used. Tianshan Shengli Tunnel adopts phased forced ventilation option, and the ventilation mode is designed in stages with the change of tunnel construction stage. The fans and air pipes used are imported ones, and a ventilation management team is set up to strengthen ventilation management and ensure ventilation quality. Highly mechanized construction is used for the two D&B main tunnels, the application of equipment such as three-arm rock drilling jumbo and wet shotcrete machine is promoted, so as to reduce the number of workers and labor intensity, and improve work efficiency. The deep shafts of Tianshan Shengli Tunnel are constructed by short-section excavation and lining mixed operation method, and the initial support is lined by formwork pouring concrete, so as to realize safe and rapid excavation. According to the research results, the construction technology scheme for Tianshan Shengli Tunnel can meet the needs of tunnel construction. The research results can be directly used to guide the construction of Tianshan Shengli Tunnel, and provide reference for the construction of extra long highway tunnels in high-altitude areas.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Shuaishuai1 MAO Jinbo2 ZHANG Binbin2 Li Yalong2 ZHAO Honggang2
KeywordsTianshan Shengli Tunnel   Expressway   Extra long tunnel   Three-tunnel method   Middle pilot tunnel   TBM   Shaft     
Abstract: With a total length of about 22 km, Tianshan Shengli Tunnel on Urumqi-Yuli Expressway is currently the longest expressway tunnel under construction in the world. It adopts the construction scheme of "3 tunnels (2 D&B main tunnels and 1 TBM-driven middle pilot tunnel) + 4 shafts", which is characterized by great construction difficulty and high technical standard requirements. The tunnel construction is faced with technical challenges such as TBM passing through large fault fracture zones, long-distance construction ventilation in three tunnels, deep and large shaft construction and logistics organization in two-main tunnel construction assisted by middle pilot tunnel.In the parallel three-tunnel method design of Tianshan Shengli Tunnel, the TBM-driven middle pilot tunnel can not only play the role of advanced pilot tunnel, but also assist the construction of the two main tunnels and speed up the construction progress. For the middle pilot tunnel, the TBM excavation diameter is 8.4 m, and the initial support is designed as 100% force-bearing capacity in construction period, which can meet the requirements for two-way material transportation, ventilation and belt mucking in the pilot tunnel. Vault suspension scheme is adopted for the continuous belt conveyor, which can reduce the impact on the material flow organization in the cross passages. Multifunctional service vehicles (MSVs) independently developed by CCCC Group are used for the transportation of TBM materials and prefabricated inverted arch blocks, which can realize double-headed driving. TBM will pass through two large fault fracture zones F6 and F7. According to the stability of the surrounding rock at the tunnel face, the targeted treatment measures would be adopted. If necessary, the scheme of "steel segment + extruded concrete" shall be used for the initial support. In case of serious machine jamming or rock collapse, the heading expansion excavation method or bypass heading method shall be used. Tianshan Shengli Tunnel adopts phased forced ventilation option, and the ventilation mode is designed in stages with the change of tunnel construction stage. The fans and air pipes used are imported ones, and a ventilation management team is set up to strengthen ventilation management and ensure ventilation quality. Highly mechanized construction is used for the two D&B main tunnels, the application of equipment such as three-arm rock drilling jumbo and wet shotcrete machine is promoted, so as to reduce the number of workers and labor intensity, and improve work efficiency. The deep shafts of Tianshan Shengli Tunnel are constructed by short-section excavation and lining mixed operation method, and the initial support is lined by formwork pouring concrete, so as to realize safe and rapid excavation. According to the research results, the construction technology scheme for Tianshan Shengli Tunnel can meet the needs of tunnel construction. The research results can be directly used to guide the construction of Tianshan Shengli Tunnel, and provide reference for the construction of extra long highway tunnels in high-altitude areas.
KeywordsTianshan Shengli Tunnel,   Expressway,   Extra long tunnel,   Three-tunnel method,   Middle pilot tunnel,   TBM,   Shaft     
Received: 2021-07-21;
Cite this article:   
WANG Shuaishuai1 MAO Jinbo2 ZHANG Binbin2 Li Yalong2 ZHAO Honggang2 .General Construction Technology Scheme of Tianshan Shengli Tunnel on Urumqi-Yuli Expressway[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 55-68
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I1/55
 
No references of article
[1] FENG Huanhuan1,2 HONG Kairong1,2 YANG Yandong2 YANG Luwei1 SI Jingzhao1 YOU Jinhu3.Research and Application of Key Construction Technologies for TBM-driven Tunnels under Extreme Complex Geological Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 42-54
[2] WANG Fei.A Model Test Study on the Dewatering in the Construction of Ultra-deep Shafts in Deep and Thick Sand and Pebble Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 176-182
[3] ZHANG Jinliang1 HUANG Qiuxiang2 WANG Xueying1 HU Chao2 ZHANG Shaoxuan2.Study on Engineering Influence of Defects in Pea Gravel Backfilling and Grouting Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 163-172
[4] GAO Xin WANG Wenjuan LI Qingfei FENG Shijie WU Qi.Research on the Routing Scheme of a Double Shield TBM Passing through the Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 56-64
[5] LIU Hebing.Study on the Impact of the Capacity Expansion and Renovation Project of the Chengdu-Chongqing Expressway on Xinshuangbei Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 229-234
[6] Zhou Wenjun.Study on Water Inflow Prediction Technology for Guanshan Tunnel on Tianshui-Pingliang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 22-30
[7] YANG Jihua1 GUO Weixin1 YAN Changbin2 MIAO Dong1.Study on Optimization of TBM Driving Parameters Based on the Energy Consumption[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 54-60
[8] FAN Lei YANG Changyu.Study on the Evacuation and Rescue Technology for Super-long Railway Tunnels with Super-deep Shafts in Disaster Scenarios[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 1-7
[9] XU Peng1 HUANG Jun1 ZHOU Jianbo1 TANG Jinzhou2.3D Numerical Simulation of the Interaction between Rock Mass and Shield TBM Passing through the Fault Fracture Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 63-69
[10] LI Gang1 LI Xiaojun1 YANG Wenxiang2 HAN Dong1.Research on Prediction of TBM Driving Parameters Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 154-159
[11] WANG Yanqing ZENG Nianchang LIU Bolong.Analysis on Infrared Radiation Temperature Characteristics of Jointed Rock Masses with Different Orientations under Action of Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 193-199
[12] YANG Tianren HE Fei NING Xiangke ZHANG Xiao TIAN Yanchao.Design and Application of Advanced Geological Prediction System of TBM for Gaoligongshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 37-42
[13] LI Qiang.Study on Cover-cut Method for the Super-Shallow High-speed Railway Tunnels beneath an Expressway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 161-166
[14] QIAN Zhengfu1 XU Jinfeng2,3 ZHOU Yingxin1,2,3 ZHOU Biao2,3 XIE Xiongyao2,3.Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 167-174
[15] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY