Study on Stratum Deformation Caused by Large-section Rectangular Pipe Jacking and Jacking Parameter Control
(1. China Railway First Group Co., Ltd., Xi′an 710054; 2. Chang′an University, Xi′an 710064)
Download: PDF (7516KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the pipe jacking works of Wuhan Metro Line 7, a numerical model for ground settlement during jacking construction was established to analyze the relationship between the jacking force and the stratum deformation. The data of earth pressure, thrust and stratum settlement during the construction of different pipe jacking works were compared, and the law of the influence of burial depth and geological conditions on jacking parameters was summarized. The study shows that (1) during pipe jacking, soil disturbance causes ground settlement or uplift and also leads to soil uplift within the range of 2D~4D below the pipe (D is the pipe height); (2) the surface in front of the tunnel face uplifts by the action of additional jacking force, while the soil behind the tunnel face settles by the action of excavation unloading; (3) the uplift peak appears on the ground 1H (H is the burial depth) right in front of the head of pipe-jacking machine, and ground settlement changes quickly within 5 m behind the tunnel face; (4) as the additional jacking force increases, ground settlement right above the head of pipe-jacking machine is reduced, and when the jacking force is greater than 20 000 kN, the variation gradually decreases and the amplitude of variation is relatively small.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XU Hong1 YE Fei2 LIU Qi1 TIAN Liming1 AN Huan1
KeywordsRectangular pipe jacking   Large-section   Numerical simulation   Stratum deformation   Control technology     
Abstract: Based on the pipe jacking works of Wuhan Metro Line 7, a numerical model for ground settlement during jacking construction was established to analyze the relationship between the jacking force and the stratum deformation. The data of earth pressure, thrust and stratum settlement during the construction of different pipe jacking works were compared, and the law of the influence of burial depth and geological conditions on jacking parameters was summarized. The study shows that (1) during pipe jacking, soil disturbance causes ground settlement or uplift and also leads to soil uplift within the range of 2D~4D below the pipe (D is the pipe height); (2) the surface in front of the tunnel face uplifts by the action of additional jacking force, while the soil behind the tunnel face settles by the action of excavation unloading; (3) the uplift peak appears on the ground 1H (H is the burial depth) right in front of the head of pipe-jacking machine, and ground settlement changes quickly within 5 m behind the tunnel face; (4) as the additional jacking force increases, ground settlement right above the head of pipe-jacking machine is reduced, and when the jacking force is greater than 20 000 kN, the variation gradually decreases and the amplitude of variation is relatively small.
KeywordsRectangular pipe jacking,   Large-section,   Numerical simulation,   Stratum deformation,   Control technology     
Cite this article:   
XU Hong1 YE Fei2 LIU Qi1 TIAN Liming1 AN Huan1 .Study on Stratum Deformation Caused by Large-section Rectangular Pipe Jacking and Jacking Parameter Control[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 97-105
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I6/97
 
No references of article
[1] SONG Zhanping1,2,3 PEI Jiafeng1,3 PAN Hongwei2,4 SUN Ze1,3 DING Libo5.Analysis on the Support Effect of Advance Large Pipe Umbrella at Portal Section of Shallow Tunnel under Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 86-96
[2] WANG Wei1,2 LI Xianmin1 SUN Xinhai1,2.Numerical Simulation Study on the Supporting Effect of Bolts in Interbedded Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 99-107
[3] LEI Zhongdai1,2 KONG Xinli3 WANG Wenye3 YAN Zhiguo1,2.Numerical Simulation Study on Loosened Zone of Surrounding Rock of Large-span Flat Caverns[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 41-46
[4] ZHAO Sensen ZHANG Dongmei HUANG Zhongkai.Mechanical Characteristics of Distributed Mortise-and-Tenon of Largediameter Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 54-62
[5] LU Xiaogang1 GENG Jianyu1 PANG Lei1 FAN Jinhai1 LI Liangyong1 FANG Yabiao2,3 WANG Feng2,3.Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 80-90
[6] YU Guoliang1 LOU Yili2,3 WU Guopeng1 SHI Chenghua2,3 ZHENG Keyue2,3.Study on Deformation Control Technology for Unsymmetrically Loaded Tunnels in Bedding Strata under High Geo-stress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 237-245
[7] LIU Zhaowei.Research on the Technology for the Shield Tunnel Crossing the Railway Marshalling Station in the Pebble-boulder Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 226-233
[8] YU Jianyou1 JIANG Yifan2 LIN Ming2 LIU Jianqi1 CAI Libin2 JIANG Xinzheng2 WANG Zhijie2 ZHOU Ping2.Thickness Calculation Method for the Insulation Layer of the Tunnel in Cold Region Considering Seepage and Fissures[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 108-117
[9] LI Weilin1 ZHANG Guang1 ZHU Yingwei1 HU Shaohua1,2.A 3D Numerical Simulation Study on the Ventilation of T-Shaped Tunnels with Different Bifurcation Angles during Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 158-166
[10] WEN Yanxin1 HUO Yongpeng2 WU Yue2 CHANG Xin1 ZHANG Tian2 YAN Qixiang2.Assembly Force and Waterproofing Performance of Segment Sealing Gasket in High Water Pressure Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 273-
[11] TANG Yan.Research on Risk Assessment and Management Methods for Projects of Railway Tunnels Passing under Expressways[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 220-226
[12] MIAO Chenyang1 HUANG Qiangbing1,2 GOU Yuxuan1 TENG Hongquan3 JIA Shaochun4.Study on the Impact of Shield Tunnel Under-crossing at Ground Fissure Site on Existing Utility Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 155-165
[13] ZHU Muyuan1 WEI Lifeng1 FANG Yong1 FU Qiang2 GAO Tengda2 PU Song1.Analysis and Control of the Settlement of Super-large Diameter Shield Tunnel Passing under the Yellow River Embankment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 211-219
[14] WEI Zhiyuan1 FENG Jimeng2 YU Longping2.Study on the Mechanical Behavior of the the Double-layer Arch Cover Initial Support during the Construction of Subway Stations by Arch-cover Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 265-274
[15] YU Lingfeng.Research on the Characteristics of Structural Dynamic Response and the Seismic Mechanism of Mountain Tunnels with Different Depths[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 227-235