Key Technologies for Treating Large-scale Water and Mud Inrush in Inclined Shaft Work Area of Super-long Tunnels
(China Construction Seventh Engineering Division Corp. Ltd., Zhengzhou 450004)
Download: PDF (6099KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract When the construction of the 2# inclined shaft work area of the super-long tunnel of Yingpanshan on the Huaping-Lijiang Expressway in Yunnan Province is tunnelled to ZK26+188, a large-scale continuous water and mud inrush occurred at the tunnel face. In response to shaft flooding and long-term water inflow at the inclined shaft mouth caused by water and mud inrush at ZK26+188, the mechanism of water inrush is analyzed and studied. Three treatment plans are comprehensively compared, and a water discharge treatment plan of "temporarily put aside the inclined shaft, discharge high-pressure water from main tunnel work area, implement the plan in phases, and steadily approach the head of the inclined shaft" is proposed. The water discharge problem is successfully overcome, and the water in the inclined shaft is safely discharged. The treatment plan has significant comprehensive benefits such as safety and economy, and can provide guidance and reference for the treatment of geological disasters in similar super-long, high-pressure, water-bearing karst tunnels.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LANG Zhijun LI Mangyuan QIAO Haiyang
KeywordsSuper-long tunnel   Inclined shaft work area   Karst   Groundwater   Water and mud inrush   Water dis? charge treatment     
Abstract: When the construction of the 2# inclined shaft work area of the super-long tunnel of Yingpanshan on the Huaping-Lijiang Expressway in Yunnan Province is tunnelled to ZK26+188, a large-scale continuous water and mud inrush occurred at the tunnel face. In response to shaft flooding and long-term water inflow at the inclined shaft mouth caused by water and mud inrush at ZK26+188, the mechanism of water inrush is analyzed and studied. Three treatment plans are comprehensively compared, and a water discharge treatment plan of "temporarily put aside the inclined shaft, discharge high-pressure water from main tunnel work area, implement the plan in phases, and steadily approach the head of the inclined shaft" is proposed. The water discharge problem is successfully overcome, and the water in the inclined shaft is safely discharged. The treatment plan has significant comprehensive benefits such as safety and economy, and can provide guidance and reference for the treatment of geological disasters in similar super-long, high-pressure, water-bearing karst tunnels.
KeywordsSuper-long tunnel,   Inclined shaft work area,   Karst,   Groundwater,   Water and mud inrush,   Water dis? charge treatment     
Cite this article:   
LANG Zhijun LI Mangyuan QIAO Haiyang .Key Technologies for Treating Large-scale Water and Mud Inrush in Inclined Shaft Work Area of Super-long Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(5): 224-233
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I5/224
 
No references of article
[1] LUO Ziqing1 ZHOU Rui2 LUO Junhui1 JIANG Yajun2 WU Chunwei1 YANG Yonghua1.Study on DERU Testing and Evaluation Technology for Civil Structures of Highway Tunnels in Karst Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(5): 243-253
[2] YUAN Chuanbao1 LU Jinlin1 TAO Yujing1 SONG Zhang1 LIU Guoqiang2.Study on Major Engineering Geological Problems of Yuelongmen Tunnel in Mountain Areas Under Complex Strong Earthquake Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 188-195
[3] SUN Keguo1 ZHEN Yingzhou1 WEI Yong1 XIAO Zhifei2 YANG Peng3 FANG Chunbin4.Influence Law and Analysis of Foundation Pit Stability in Water-bearing Karst Area[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 149-158
[4] ZHANG Ning1,2 WANG Mengya2,3 WANG Chuan1,2 LI Zhaofeng2,3 MA Chuanyi1,2.Study on the Preparation and Performance of Red Mud-based Grouting Reinforcement Materials[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 270-280
[5] ZHANG Peng1 WANG Lichuan2, 3 LI Linyi3 YAO Yong1 ZHANG Xuemin3 ZHENG Bo4 LIU Maobing5.The Concept and Practice of Treatment for Damage in Railway Tunnel Linings Caused by High-pressure Karst Water[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 227-241
[6] CHEN Zhongda1 LIN Zhi2 CHEN Xiang2 YANG Hongyun2 LU Yuanen3 ZHAO Yixin2.Study on the Water Inrush Mechanism in Tunnelling with Karst Conduits Based on Nonlinear Seepage Model[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 149-155
[7] ZHU Weibin1, 2 ZHANG Hua3 HUANG Hui4.Analysis of and Prevention Countermeasures for Underground Engineering Risks in Red Bed Areas with Developed Karst[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 179-186
[8] LI Shenkui Tao Lan WU Shengxian.Discussion and Application of New Grouting Technology in Hourglass-shaped Karst in Wuhan Metro Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 187-195
[9] MA Shiqiang.Dialectical Thinking on Solving Major Issues in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 17-22
[10] ZHANG Junfeng1 LI Qiang2 SHI Yongyue2 WU Lei2.On Development Law of Karst Water and Prediction of Water Inflow in a Tunnel in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 14-21
[11] HONG Yingwei1,2 QIAN Xiaqing3 LI Junhui3 YANG Henwei4 ZHANG Peng3.On Scavenging Performances of Cleaning Solvents for the Clogging in the Drainage System of Karst Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 160-170
[12] TIAN Ruizhong.Mined Construction Technology of Tunnel Group at the Junction of Metro Main line and Connection Line in Karst Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 193-199
[13] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[14] XIANG Daoyin1 WANG Minghui1 ZHU Jianguo2 LIU Dalin2 ZHANG Qiao1.Key Techniques for Rapid Construction of Parallel Heading of Karst Tunnel in Chongqing Section of Zhengzhou-Wanzhou Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 194-200
[15] HONG Yingwei1, 2.Structural Non-destructive Evaluation of Cleaning Solvent for Clogging Removing of Karst Tunnel Drainage System[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 219-
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY