|
2023, Vol. 60(5): 224-233 DOI: | ||
Key Technologies for Treating Large-scale Water and Mud Inrush in Inclined Shaft Work Area of Super-long Tunnels | ||
(China Construction Seventh Engineering Division Corp. Ltd., Zhengzhou 450004) | ||
Received null Revised null | ||
Supporting info | ||
|