Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2025, Vol. 62 Issue (1) :147-156    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on the Effect of Shield Tunnelling Parameters on Cutting Performance of Reinforced Concrete Based on FEM-DEM Coupling Method
(China Railway 14th Corporation Mega Shield Construction Engineering Co., Ltd., Nanjing 211800)
Download: PDF (7822KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The shield cutting reinforced concrete piles involves a transient dynamic process between the disc cutter and the reinforced concrete. This study uses a Finite Element Method (FEM) and Discrete Element Method (DEM) coupled model to perform a three-dimensional transient dynamic analysis of the shield disc cutter cutting reinforced concrete piles. In the FEM-DEM coupled model, the mechanical behavior of concrete is described using DEM,while the effect of rebar in the concrete is simulated with FEM. The accuracy and reliability of the numerical simulation results were verified by laboratory tests, showing a good agreement between the simulation results and experimental data. Additionally, the study analyzes the impact of shield machine penetration and cutterhead rotational speed on the cutting performance of the disc cutter, providing optimal penetration, cutterhead rotational speed, and tunnelling mode for cutting reinforced concrete piles.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
MU Zheng LI Fulin
KeywordsShield cutting pile   Cutter   Reinforced concrete   Pile foundation   Penetration   Cutterhead rotational speed   FEM-DEM coupled model     
Abstract: The shield cutting reinforced concrete piles involves a transient dynamic process between the disc cutter and the reinforced concrete. This study uses a Finite Element Method (FEM) and Discrete Element Method (DEM) coupled model to perform a three-dimensional transient dynamic analysis of the shield disc cutter cutting reinforced concrete piles. In the FEM-DEM coupled model, the mechanical behavior of concrete is described using DEM,while the effect of rebar in the concrete is simulated with FEM. The accuracy and reliability of the numerical simulation results were verified by laboratory tests, showing a good agreement between the simulation results and experimental data. Additionally, the study analyzes the impact of shield machine penetration and cutterhead rotational speed on the cutting performance of the disc cutter, providing optimal penetration, cutterhead rotational speed, and tunnelling mode for cutting reinforced concrete piles.
KeywordsShield cutting pile,   Cutter,   Reinforced concrete,   Pile foundation,   Penetration,   Cutterhead rotational speed,   FEM-DEM coupled model     
Cite this article:   
MU Zheng LI Fulin .Study on the Effect of Shield Tunnelling Parameters on Cutting Performance of Reinforced Concrete Based on FEM-DEM Coupling Method[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 147-156
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2025/V62/I1/147
 
No references of article
[1] LIU Shaoqiang1 XU Jianshu2 YANG Xiu2 TANG Qisheng1 XIE Xingfei1 GONG Qiuming1 ZHOU Xiaoxiong3.TBM Cutter Edge Tip Wear Phenomenon and Wear Evolution Characteristics[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 20-27
[2] GENG Qi1 HUANG Dengxia2 CHEN Jianxun3 LIU Weiwei3 LUO Yanbin3 MA Maoxun1 LI Xiaobin1.Study on Cutting Performance of New Wedge-flat Combined TBM Cutters in Extreme Hard Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 114-124
[3] YANG Wendong1 WU Yang1 WANG Zhide1 WU Haigang1,2 LI Gen1.Experimental Study on the Influence Zoning on Existing Pile Foundations Induced by Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 200-208
[4] CHEN Yifan1 HUANG Shuhua2 SHEN Xiang1, 3, 4 SHENG Jian2 CHEN Xiangsheng1, 3, 4 ZHANG Liang2.Analysis on the Vibration Influence on Upper Buildings Induced by Cutting of Pile Group by Extra-large-diameter Shield in Dense Urban Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 266-275
[5] GE Zhaoguo.Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 276-289
[6] WANG Defu.Study on Interaction Mechanism and Key Parameters of Shield Cutter Cutting the Pile Foundation—Case Study of Haizhu Bay Shield Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 216-228
[7] XIONG Yingjian1 LIU Sijin2 MA Yuyang2 FANG Yong1 HE Chuan1.Optimization Method for Shield Tunnelling Parameters Based on PSO Algorithm and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 165-174
[8] ZHANG Qin1 SU Jinhua2 LI Aijun1 XU Binbin1 YAN Xiaolei1 LIU Ding1 YANG Junqi1TANG Jintao1 LI Hongsheng3.Study on Rock Breaking Mechanism of Undercutting Cutter at Precut Slot on Free Surface[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 192-198
[9] ZHAI Shufang1,2 DU Hongkun1 YUE Qichao1 WU Fan3 GONG Qiuming4.Analysis of the Optimal Penetration of Disc Cutter in Rock Breaking Based on Characteristic Particle Size[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 147-152
[10] SONG Yi1,2.Study on the Structural Design for Tunnels Undercrossing Airport Section in High-speed Railway Throat Area under a Complex Environment[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 213-221
[11] WANG Lichuan1,2 FU Boyi2 ZHANG Huijian2 JI Guodong1 GENG Qi3 WANG Zhengzheng4.Differences in Mechanical Responses of Granite and Limestone when Cut by TBM Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 81-89
[12] NING Xiangke1 GENG Qi2 LU Zhiyong2 YU Qingzeng1.A Study on the Rock-breaking Mechanism of Disc Cutters on Cone Cutterhead of Full-face Tunnel Boring Machines[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 73-83
[13] WANG Mingjiang1 CI Xinhang2 CHEN Junwu3 ZHU Changjiang1 YANG Feng2.Construction Technology for the Shallow Twin-tube Six-lane Multi-arch Tunnel without Middle Drift under Large Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 241-248
[14] YANG Xiong1 MENG Qinghui2 LI Pin1 XU Dengfei3 CAO Feng1.Design and Analysis of the Tunnel Section at Railway Station Crossing Under the Pile Foundation[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 218-225
[15] LIANG Erbin.Study of the Settlement Control of Deformation Joints of Tunnels Passing Closely under the Existing Station[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 182-191
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY