Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (2) :157-160    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Establishment and Application of Independent Surveying Coordinate System for Super-long Tunnels' Construction
(Project Management Department of Lanzhou-Chongqing Railway, China Railway No.19 Construction Bureau Group, Dingxi  743000)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Independent construction surveying coordinate system can be established in super-long tunnels by making use of more than two geodetic coordinate systems after introducing the existing data of control net into the tunnel, which can simplify the working procedures of measurement, shorten the time of both interior and outside measuring work and interior work time, and reduce the mistakes due to personal factors. This independent construction surveying coordinate system together with calculator programs can be applied to tunnel construction lofting and cross-section inspection.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
BAO Wan-Sheng
Gong-Hua-Yong
ZHAO Bo
KeywordsIndependent construction coordinate system   Straight line tunnel   Curved tunnel   Program     
Abstract: Independent construction surveying coordinate system can be established in super-long tunnels by making use of more than two geodetic coordinate systems after introducing the existing data of control net into the tunnel, which can simplify the working procedures of measurement, shorten the time of both interior and outside measuring work and interior work time, and reduce the mistakes due to personal factors. This independent construction surveying coordinate system together with calculator programs can be applied to tunnel construction lofting and cross-section inspection.
KeywordsIndependent construction coordinate system,   Straight line tunnel,   Curved tunnel,   Program     
published: 2011-03-04
Cite this article:   
BAO Wan-Sheng, Gong-Hua-Yong, ZHAO Bo .Establishment and Application of Independent Surveying Coordinate System for Super-long Tunnels' Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(2): 157-160
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I2/157
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY