Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (5) :76-81    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of the Fuzzy Comprehensive Evaluation Method to Karst Forecasting in Tunnel Construction
(Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074 )
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Fuzzy Comprehensive Evaluation was used in establishing an application model for karst prediction in tunnel construction. Based on fuzzy mathematics theory, the comprehensive construction geological prediction system of "geological method +TRT + GPR + advanced wind drilling," and six evaluation factors (investigation and geology survey data, TRT results figure chromatographic characteristics, the comprehensive characteristics of electromagnetic waves, advanced wind drilling, working face dissolution and development of groundwater), an application model of fuzzy comprehensive evaluation method for karst prediction in tunnel construction was established and applied to the Chunshuya Tunnel of the Wu Shen highway.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XU Shan-Chu
Chen-Jian-Ping
Zuo-Chang-Qun
Zhang-Shi-Lin
Keywords Comprehensive fuzzy evaluation method   Comprehensive advanced geological forecast   Karst   Tunnel construction     
Abstract: Fuzzy Comprehensive Evaluation was used in establishing an application model for karst prediction in tunnel construction. Based on fuzzy mathematics theory, the comprehensive construction geological prediction system of "geological method +TRT + GPR + advanced wind drilling," and six evaluation factors (investigation and geology survey data, TRT results figure chromatographic characteristics, the comprehensive characteristics of electromagnetic waves, advanced wind drilling, working face dissolution and development of groundwater), an application model of fuzzy comprehensive evaluation method for karst prediction in tunnel construction was established and applied to the Chunshuya Tunnel of the Wu Shen highway.
Keywords Comprehensive fuzzy evaluation method,   Comprehensive advanced geological forecast,   Karst,   Tunnel construction     
published: 2011-07-18
Cite this article:   
XU Shan-Chu, Chen-Jian-Ping, Zuo-Chang-Qun etc .Application of the Fuzzy Comprehensive Evaluation Method to Karst Forecasting in Tunnel Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(5): 76-81
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I5/76
 
No references of article
[1] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[2] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[3] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 106-114
[4] QU Haobo1,2 LI Lin2.Preliminary Analysis of Causes of Closing Type Blockage Disasters during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 51-55
[5] ZHANG Tao.Rapid Construction Technique for a Large Upper-Section of the Tianping Tunnel in Soft Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(6): 203-209
[6] .Analysis of the Reliability of Advanced Geological Prediction during TunnelConstruction Based on the Attribute Recognition Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 48-55
[7] .Strata Disturbance Influenced by Soil Mechanical Parameters Varying with Dynamic Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 131-136
[8] GUO Ru-Jun- 1, 2 He-Fa-Liang- 2.Geological Structures Inclined to Hazards due to Water Burst in Tunnel construction and Their Classifications[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 55-60
[9] ZHANG Zhi-Guo- 1, 2 , 3 , 4 Lu-Ming-Hao- 2 Xu- Chen- 2 Gong-Jian-Fei- 3 Zhao-Qi-Hua- 4.Simplified Solution for Tunnelling-Induced Pile Foundation Deformation Based on the Kerr Foundation Model[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 55-66
[10] SONG Li.Key Techniques for Construction of the Taiyue Mountain Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 194-199
[11] .Monitoring Data Processing, Feedback Analysis and Stability Prediction during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 121-127
[12] YU Gang1,2, HU Min1,2, GAO Xinwen2,3, CHEN Lisheng4, ZHAO Guoqiang4.BIM Based 3D Visual Construction Management System for Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(1): 1-5
[13] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[15] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY