Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (5) :76-81    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of the Fuzzy Comprehensive Evaluation Method to Karst Forecasting in Tunnel Construction
(Faculty of Engineering, China University of Geosciences (Wuhan), Wuhan 430074 )
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Fuzzy Comprehensive Evaluation was used in establishing an application model for karst prediction in tunnel construction. Based on fuzzy mathematics theory, the comprehensive construction geological prediction system of "geological method +TRT + GPR + advanced wind drilling," and six evaluation factors (investigation and geology survey data, TRT results figure chromatographic characteristics, the comprehensive characteristics of electromagnetic waves, advanced wind drilling, working face dissolution and development of groundwater), an application model of fuzzy comprehensive evaluation method for karst prediction in tunnel construction was established and applied to the Chunshuya Tunnel of the Wu Shen highway.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
XU Shan-Chu
Chen-Jian-Ping
Zuo-Chang-Qun
Zhang-Shi-Lin
Keywords Comprehensive fuzzy evaluation method   Comprehensive advanced geological forecast   Karst   Tunnel construction     
Abstract: Fuzzy Comprehensive Evaluation was used in establishing an application model for karst prediction in tunnel construction. Based on fuzzy mathematics theory, the comprehensive construction geological prediction system of "geological method +TRT + GPR + advanced wind drilling," and six evaluation factors (investigation and geology survey data, TRT results figure chromatographic characteristics, the comprehensive characteristics of electromagnetic waves, advanced wind drilling, working face dissolution and development of groundwater), an application model of fuzzy comprehensive evaluation method for karst prediction in tunnel construction was established and applied to the Chunshuya Tunnel of the Wu Shen highway.
Keywords Comprehensive fuzzy evaluation method,   Comprehensive advanced geological forecast,   Karst,   Tunnel construction     
published: 2011-07-18
Cite this article:   
XU Shan-Chu, Chen-Jian-Ping, Zuo-Chang-Qun etc .Application of the Fuzzy Comprehensive Evaluation Method to Karst Forecasting in Tunnel Construction[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(5): 76-81
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I5/76
 
No references of article
[1] WANG Lichuan1,2 YAN Guangtian1 YUAN Wei GAO Hongbing4 LI Liping2 ZHANG Chunyu1,5 WU Jian4 ZHANG Long3.Development and Application of TBM-mounted Omni-directional and Normal Deep Anchor Hole Drilling Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 67-74
[2] WANG Liuxun.Study on the Construction Equipment Configuration Scheme for Tunnelling under High Altitude, Low Oxygen Content and Low Atmospheric Pressure Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 259-265
[3] SANG Conghui1,2 QIAO Liwei1,2 WANG Lieni3 YUAN Wenchao4 ZHAO Yanfa5.High-precision Discrete Simulation Method of Floating Dusts Based on Two-stage Solution and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 203-211
[4] WANG Wei1,2 LI Xianmin1 SUN Xinhai1,2.Numerical Simulation Study on the Supporting Effect of Bolts in Interbedded Soft Rock Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 99-107
[5] WANG Zhijie1 LI Jinyi1 DENG Yuhang1 DU Yiwen1 ZHOU Ping1 BAI Xiaoke2 LI Fenggang2.On Defects and Disaster-causing Factors in Tunnelling in Salt Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 46-55
[6] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[7] HE Faliang.On the Problem of“Geologic Uncertainty”in Tunnelling and Its Solutions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 8-13
[8] HUANG Jifu XIAO Gongyi.Study on Practical Application and Adaptability of the Roadheader in Transportation Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 51-62
[9] SONG Junxiu1 WAN Xiaolin2 GUO Chun1.Study on Construction Ventilation Scheme of Air Cabin for An′ding Tunnel on Yumo Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 232-238
[10] LU Song1,2 WANG Xu1,2 LI Cangsong1,2 MENG Lu1,2.Study on Geological Prediction Technology of HSP Method for TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 30-35
[11] YU Jianxin1 LIU Huanchun2 WEI Haixia1 CHEN Chen2.On Mutual Dynamic Effect of Tunnel Blasting Construction Adjacent to Existing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 85-92
[12] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[13] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 106-114
[14] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[15] QU Haobo1,2 LI Lin2.Preliminary Analysis of Causes of Closing Type Blockage Disasters during Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 51-55
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY