Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (6) :124-130    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Cause Analysis of and Preventive Measures for Circumferential Cracks Occurring in the Lining of a Tunnel with Intact Bedrock
(China Railway No.2 Engineering Group Co., Ltd,Fuzhou  350700)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract   Based on the statistics of the circumferential cracks in the secondary linings of the seven tunnels with intact bedrocks on the Xiangtang-Putian railway, a comprehensive analysis of the causes of lining cracking was performed. This paper elaborates on the troubles encountered and the control methods used during the design and construction phases in light of the cracks that occurred in the concrete structures. In addition, corresponding countermeasures and suggestions are addressed.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHANG Zhong-Hou
Liu-Shi-Jie
Zeng-Jie
Keywords    Combined lining   Crack   Cause analysis   Preventive measures     
Abstract:   Based on the statistics of the circumferential cracks in the secondary linings of the seven tunnels with intact bedrocks on the Xiangtang-Putian railway, a comprehensive analysis of the causes of lining cracking was performed. This paper elaborates on the troubles encountered and the control methods used during the design and construction phases in light of the cracks that occurred in the concrete structures. In addition, corresponding countermeasures and suggestions are addressed.
Keywords ,   Combined lining,   Crack,   Cause analysis,   Preventive measures     
published: 2011-08-31
Cite this article:   
ZHANG Zhong-Hou, Liu-Shi-Jie, Zeng-Jie .Cause Analysis of and Preventive Measures for Circumferential Cracks Occurring in the Lining of a Tunnel with Intact Bedrock[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(6): 124-130
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I6/124
 
No references of article
[1] ZOU Yulin1, 2 LIU Jing1 WANG Bo2 CHENG Ziquan2 XIE Zuodong2 GU Hao3 WANG Kaiyue.Study on the Causes and Prevention Measures of Water and Mud Inrush Disasters in Sichuan Yanjiang Expressway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 259-269
[2] ZHANG Yu1 ZHOU Lu1 SUN Xiaohe2 LI Jun1 SHI Chenghua2 LIU Shengli.Research on Causes and Countermeasures of Water Leakage in Subway Tunnels in Coastal Area[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 234-424
[3] DU Yi CHENG Qiang.Study and Analysis of the Mechanism of Gas Emission (Outburst) in Miyaluo No.3 Tunnel on Wenchuan-Maerkang Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 203-209
[4] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[5] ZHANG Tiantao1 ZHANG Weiyi2.On the Key Points of Tunnel Invert Heaving and Its Prevention Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 162-166
[6] ZHAO Yangchuan LI Yalin WEI Min DUAN Jucai.Discussion on Causes of and Preventive Measures against Tunnel Lining Voids and Inadequate Thickness[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 40-43
[7] WANG Zaimin1 CHEN Yulin1 XU Mo1 ZHANG Shishu2 YONG Ping1.Study on Water Inflow and Burst in the Hydraulic Tunnel of Hydropower Projects in Southwest China[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 27-32
[8] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[9] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[10] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[11] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[12] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[13] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[14] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[15] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY