|
2011, Vol. 48(6): 124-130 DOI: | ||
Cause Analysis of and Preventive Measures for Circumferential Cracks Occurring in the Lining of a Tunnel with Intact Bedrock | ||
(China Railway No.2 Engineering Group Co., Ltd,Fuzhou 350700) | ||
Received null Revised null | ||
Supporting info | ||
|