Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (5) :15-22    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Application of TBMs in the Construction of Urban Rail Transit
China Railway First Survey and Design Institute Group Ltd.
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The drill and blast method is not a good option for the construction of urban rail transit systems considering its disturbance to residents and environmental impact. Considering the characteristics of urban rail transit and the design and construction of Chongqing Metro Line 6 and Qingdao Metro Line 2, a full study was carried out regarding the control condition of horizontal and vertical sections, overburden depth, TBM passing through station, TBM selection, support structure, and transportation mode as well as risks related to TBM construction. The results showed that: it is possible for urban rail transit to utilize the TBM method with controllable risks; a single-shield TBM should be the main machine used for the urban rail transit construction; segments should be the primary lining; and translation should be taken as far as possible when the TBM passes the station.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: The drill and blast method is not a good option for the construction of urban rail transit systems considering its disturbance to residents and environmental impact. Considering the characteristics of urban rail transit and the design and construction of Chongqing Metro Line 6 and Qingdao Metro Line 2, a full study was carried out regarding the control condition of horizontal and vertical sections, overburden depth, TBM passing through station, TBM selection, support structure, and transportation mode as well as risks related to TBM construction. The results showed that: it is possible for urban rail transit to utilize the TBM method with controllable risks; a single-shield TBM should be the main machine used for the urban rail transit construction; segments should be the primary lining; and translation should be taken as far as possible when the TBM passes the station.
Keywords:   
Cite this article:   
.Application of TBMs in the Construction of Urban Rail Transit[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 15-22
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/15
 
No references of article
[1] HUANG Yinding1,2.Study on the Planning Technology for Metro Built by Double Shield TBM in Old Urban Area[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 38-44
[2] YANG Jihua1 LIANG Guohui2 CAO Jianfeng2 YANG Fengwei1.Study on Key Techniques for TBM1 Section of the Water Conveyance Tunnel of Lanzhou Water Source Construction Project[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 10-17
[3] YU Taizhang1 LI Jianbin2 JING Liujie1,3 XU Shoutian1 XU Jian′an1.Design and Practice of Cloud Computing Platform for TBM Operation Information[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 33-41
[4] HONG Kairong1,2 FENG Huanhuan1,2.Construction Difficulties and Key Techniques for the Gaoligong Mountain TBM Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 1-8
[5] ZHANG Zixin1,2 WANG Shuaifeng1,2 HUANG Xin1,2.Analysis and 3D Visualization of Surrounding Rock Stability during TBM Tunnelling in Jointed Rock Masses[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 36-43
[6] HOU Gongyu1 YANG Yue1,2 LI Xiaorui1 CUI Yongke1 ZHOU Menghui1.Longitudinal Force Transfer Law of TBM Tunnel Segments[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 65-71
[7] JIANG Zhiyi WANG Mingnian YU Li LIU Dagang WU Shengzhi.On Characteristics of Combined Support with TBM Segment and Pea Gravel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 72-77
[8] WANG Keyi1 XU Dongqiang2 SUN Xiaoshan2.Study of the Invert Installation Issues for a Three-Lane Road Tunnel in Surrounding Rock of Grade Ⅲ1[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 103-109
[9] CHEN Yixin1 CUI Genqun2 SONG Lin3.Back Analysis of the Internal Force on the Supporting Structure of a Multi-Centered Circular Arch Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 85-91
[10] XIONG Fan1 HU Zhiping1,2 REN Xiang1 ZHANG Peng.Matlab-Based BP Neural Network Applied to the Prediction of TBM Advance Rate[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 101-107
[11] JI Feng1 ZHANG Qianqi1 LI Hongming1 ZHOU Chunhong2 GAO Jishun1.Failure Characteristics and Mechanical Mechanism of Deeply-Buried Tunnels with High External Water Pressure for Drill &Blast and TBM Methods[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 138-145
[12] .Efficiency of Rock Breaking by TBM Cutters in a Joint Rock Mass with Different Confining Pressures[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 148-154
[13] 吕Rui-Hu .On Adaptability Assesment of a TBM Used in Urban Subways[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 31-39
[14] ZHANG Zhi-Qiang- Zhang- Yang- Zhang- Biao- Zeng-Bo-Wen.Optimization of the Force Applied to Cutters and the Spacing of TBM Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 108-114
[15] LIN Lai-Kuang- Guo-Jin-Cheng- Xia-Yi-Min- Wu- Yuan.Layout Optimization of TBM Gauge Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 90-96
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY