Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2013, Vol. 50 Issue (5) :45-51    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Deformation and Stability Based Study of the Construction Scheme for Shallow-Buried Tunnels in Weak Surrounding Rock
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction of a shallow-buried tunnel inevitably disturbs the stratum and causes ground settlement, especially in the building zone, where all ground loads act on building foundations, readily causing tunnel structure deformation and building settlement. Therefore the optimization of construction schemes is vital for controlling excessive deformations of the surrounding rock and reducing the settlements of surface buildings. Based on the construction of the Renhechang tunnel on the Lanzhou-Chongqing railway underneath surface buildings, a numerical simulation was carried out regarding the bench cut method, CD method, and CRD method, and a contrastive analysis of the displacement field of surrounding rock and the distribution characteristics of the plastic zone was conducted. Additionally a study of the disturbance effect of excavation on surrounding rocks near the working face was performed, and the space-time effect of surrounding rock deformation and the influence on foundation settlement were analyzed. The soundest and most economic construction scheme is presented. The results show that bench cut method is feasible for the Renhechang tunnel construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords     
Abstract: The construction of a shallow-buried tunnel inevitably disturbs the stratum and causes ground settlement, especially in the building zone, where all ground loads act on building foundations, readily causing tunnel structure deformation and building settlement. Therefore the optimization of construction schemes is vital for controlling excessive deformations of the surrounding rock and reducing the settlements of surface buildings. Based on the construction of the Renhechang tunnel on the Lanzhou-Chongqing railway underneath surface buildings, a numerical simulation was carried out regarding the bench cut method, CD method, and CRD method, and a contrastive analysis of the displacement field of surrounding rock and the distribution characteristics of the plastic zone was conducted. Additionally a study of the disturbance effect of excavation on surrounding rocks near the working face was performed, and the space-time effect of surrounding rock deformation and the influence on foundation settlement were analyzed. The soundest and most economic construction scheme is presented. The results show that bench cut method is feasible for the Renhechang tunnel construction.
Keywords     
Cite this article:   
.Deformation and Stability Based Study of the Construction Scheme for Shallow-Buried Tunnels in Weak Surrounding Rock[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(5): 45-51
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I5/45
 
No references of article
[1] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[2] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[3] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[4] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
[5] Li Xinyu, Zhang Dingli, Fang Qian, Song Haoran.On Water Burst Patterns in Underwater Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 24-31
[6] Shu Heng, Wu Shuyuan, Li Jian, Guo Xiaohong.Health Monitoring Design for Extra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 32-40
[7] Liu Guangfeng1, Chen Fangwei2, Zhou Zhi1, Zhang Shilong3, Liu Mingqiang1.Identification of Investment Risks for River-Crossing Tunnels Based on Grey Fuzzy Multi-Attribute Group Decision Making[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 41-48
[8] Yao Zhanhu.Construction Risk Assessment for the Shield-Driven Section of the Nanjing Weisan Road River-Crossing Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 49-54
[9] Zhang Boyang1, Zhao Xiaopeng1, Zhang Yaguo2, Chen Yu1.Risk Control for Saturated Hyperbaric Intervention in Slurry Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 55-61
[10] Li Yufeng1,2, Peng Limin1, Lei Mingfeng1,2.Dynamics Issues Regarding High-Speed Railway Crossing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 8-15
[11] Zhang Han1,2, Li Yingming1,3, Ren Fangtao2, Yang Mingdong3.Elasto-Plastic Analysis of the Surrounding Rock of a Tunnel/Roadway Based on the Zienkiewicz-Pande Criterion[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 30-35
[12] Zhou Zelin, Chen Shougen, Li Yansong.Study of the Mechanical Characteristics of the Support Structure of a Deeply Buried Diversion Tunnel in Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 36-43
[13] Jin Dalong, Li Xinggao.Model Test of the Relationship between the Face Support Pressure and Ground Surface Deformation of a Shield-Driven Tunnel in Sand Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 44-51
[14] Wang Yaqiong1,2, Zhou Shaowen1, Sun Tiejun3, Xie Yongli1.A Diagnosis Method for Lining Structure Conditions of Operated Tunnels Based on Asymmetric Closeness Degree[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 52-58
[15] Ji Xinbo1, Zhao Wen1, Han Jianyong1, Zhou Yongwei2, Yu Hongfu3.Parameter Analysis Considering the Impacts of the Support Structure on Ground Settlement and Inner Force During Center Drift Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 59-66
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY