Discussion of Temporary Auxiliary Facilities for the Installation of Immersed Tunnels
(CCCC Highway Consultants Co. Ltd., Beijing 100088)
Download: PDF (1250KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Since the construction of immersed tunnels involves numerous procedures such as prefabrication, floating, transportation, immersion and underwater connections, a series of temporary auxiliary facilities are required for their installation. Based on domestic and international findings regarding temporary auxiliary facilities for the installation of immersed tunnels and referencing the design and construction of the Hong Kong-Zhuhai-Macau Bridge(HZMB) Immersed Tunnel Project, this paper systematically divides the temporary auxiliary facilities into different types and analyzes their features and the items needed to meet element construction requirements. The research results show that temporary auxiliary facilities for the installation of immersed tunnels involve numerous complex systems and professions, and the final scheme should be determined by considering the actual demands of the project with classified problems, facility features, capacity and engineering factors.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsImmersed tunnel   Temporary auxiliary facility for installation   Fittings   Installation of immersed element     
Abstract: Since the construction of immersed tunnels involves numerous procedures such as prefabrication, floating, transportation, immersion and underwater connections, a series of temporary auxiliary facilities are required for their installation. Based on domestic and international findings regarding temporary auxiliary facilities for the installation of immersed tunnels and referencing the design and construction of the Hong Kong-Zhuhai-Macau Bridge(HZMB) Immersed Tunnel Project, this paper systematically divides the temporary auxiliary facilities into different types and analyzes their features and the items needed to meet element construction requirements. The research results show that temporary auxiliary facilities for the installation of immersed tunnels involve numerous complex systems and professions, and the final scheme should be determined by considering the actual demands of the project with classified problems, facility features, capacity and engineering factors.
KeywordsImmersed tunnel,   Temporary auxiliary facility for installation,   Fittings,   Installation of immersed element     
Cite this article:   
.Discussion of Temporary Auxiliary Facilities for the Installation of Immersed Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2015,V52(5): 192-199
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2015/V52/I5/192
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY