Study on the Excavation Scheme for the Deep Foundation Pit of a Subway Station Approaching an Existing Railway
(Technology Research and Development Centre of China Railway First Group Co. Ltd., Xi′an 710054)
Download: PDF (3118KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The appropriate selection of an excavation scheme is important for controlling the deformation of the deep foundation pit of a subway station approaching an existing railway. Using the foundation pit engineering of the Qianhaiwan station of Shenzhen Metro line 11 as a background, and considering the interaction of the soil mass, retaining structure and support system, a 3D numerical model is established by finite element software to carry on a dynamic study of the two excavation schemes, i.e., the open-cut bottom-up method and the cover-and-cut topdown method. The results show that the latter is more effective for controlling the deformation of the retaining structure while the bending moment and shearing force produced by the retaining structure is larger. This research provides essential theoretical data support for excavation schemes of deep foundation pit construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
SONG Lin- Li-Chang-Ning- Fan-Heng-Xiu
KeywordsDeep foundation pit   Open-cut bottom-up method   Cover-and-cut top-down method   Deformation control   3D numerical simulation     
Abstract: The appropriate selection of an excavation scheme is important for controlling the deformation of the deep foundation pit of a subway station approaching an existing railway. Using the foundation pit engineering of the Qianhaiwan station of Shenzhen Metro line 11 as a background, and considering the interaction of the soil mass, retaining structure and support system, a 3D numerical model is established by finite element software to carry on a dynamic study of the two excavation schemes, i.e., the open-cut bottom-up method and the cover-and-cut topdown method. The results show that the latter is more effective for controlling the deformation of the retaining structure while the bending moment and shearing force produced by the retaining structure is larger. This research provides essential theoretical data support for excavation schemes of deep foundation pit construction.
KeywordsDeep foundation pit,   Open-cut bottom-up method,   Cover-and-cut top-down method,   Deformation control,   3D numerical simulation     
Cite this article:   
SONG Lin- Li-Chang-Ning- Fan-Heng-Xiu .Study on the Excavation Scheme for the Deep Foundation Pit of a Subway Station Approaching an Existing Railway[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(5): 154-160
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2016/V53/I5/154
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104