Study on the Construction Mechanical Behaviors of a Subway Station by PBA Method and Optimization of the Load-Structure Model
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2 CCCC First Highway Consultants Co. Ltd., Xi′an 710075; 3 China Railway ERJU 1st Engineering Co. Ltd., Guiyang 550007)
Download: PDF (4975KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The requirements of underground subway station construction have become more complicated with the effects of, and requirements regarding, existing buildings and complex environments. The Pile-Beam-Arch (PBA) method is widely used in light of the advantages of safety and decreased impact on the environment under complex building conditions. However, the construction mechanical behavior of the PBA method is very complicated, and there are some differences between the internal forces predicted by traditional load-structure design models and the actual forces, which may result in inappropriate structure design if using the common load-structure model for a PBA subway station. Based on a station project of the Beijing metro, this paper carries out a model experimental study and numerical simulation for the mechanical behavior of the PBA method, which reveals internal force variations for the middle column, side pile and crown during the construction process, leading to a proposed modified load-structure model for mechanical analysis of the subway station by the PBA method.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
YAN Qi-Xiang- 1 Xu-Ya-Jun- 1 Liu- Gang- 1
2 He-Shou-Hai- 3
KeywordsPile-Beam-Arch (PBA) method   Subway station   Similar model test   modified load-structure model     
Abstract: The requirements of underground subway station construction have become more complicated with the effects of, and requirements regarding, existing buildings and complex environments. The Pile-Beam-Arch (PBA) method is widely used in light of the advantages of safety and decreased impact on the environment under complex building conditions. However, the construction mechanical behavior of the PBA method is very complicated, and there are some differences between the internal forces predicted by traditional load-structure design models and the actual forces, which may result in inappropriate structure design if using the common load-structure model for a PBA subway station. Based on a station project of the Beijing metro, this paper carries out a model experimental study and numerical simulation for the mechanical behavior of the PBA method, which reveals internal force variations for the middle column, side pile and crown during the construction process, leading to a proposed modified load-structure model for mechanical analysis of the subway station by the PBA method.
KeywordsPile-Beam-Arch (PBA) method,   Subway station,   Similar model test,   modified load-structure model     
Cite this article:   
YAN Qi-Xiang- 1 Xu-Ya-Jun- 1 Liu- Gang- 1, 2 He-Shou-Hai- 3 .Study on the Construction Mechanical Behaviors of a Subway Station by PBA Method and Optimization of the Load-Structure Model[J]  MODERN TUNNELLING TECHNOLOGY, 2016,V53(6): 165-173
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2016/V53/I6/165
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY