Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2017, Vol. 54 Issue (6) :126-135    DOI:
Article Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Deformation Law of a Metro Tunnel underneath an Existing Urban Road in Combination Soft/Hard Stratum
(1 School of Civil Engineering, Shandong University, Jinan 250061; 2 Jinan Municipal Engineering Design & Research Institute(Group) Co. Ltd., Jinan 250101; 3 Geotechnical and Structural Engineering Research Institute, Shandong University, Jinan 250061)
Download: PDF (5120KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Large surface settlement is often caused by tunnel construction in a stratum with a soft upper part and hard lower part, and this endangers any existing buildings. Based on the Antuo-Mountain Entrance/Exit Line project of Shenzhen subway line 7 underneath the North Ring Road, a numerical calculation model is set up by three-dimensional finite differential software FLAC3D under combination of numerical simulation and field monitoring to analyze the characteristics of ground surface settlement and stratum settlement during construction of the V-shaped tunnel underneath the existing road, and a comparison and demonstration is conducted by field monitoring and measurement. The results show: 1) the ground settlement trough mainly presents in a Y shape; 2) the superposed effect of the crown settlement trough is obvious when the interval of two tunnels is less than 2.0D, and the superposition of ground surface settlement increases greatly when the interval of two tunnels is less than 4.0D; and 3) the influential scope of overlying ground deformation decreases with an increase of the depth. The effect of advanced support on ground surface settlement is described and a comparative study of the parameters for advanced grouting is conducted so that the construction method and support measures are optimized.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsStratum with a soft upper part and a hard lower part   Metro tunnel   Numerical simulation   Ground sur? face settlement   Grouting parameters   Monitoring and measurement     
Abstract: Large surface settlement is often caused by tunnel construction in a stratum with a soft upper part and hard lower part, and this endangers any existing buildings. Based on the Antuo-Mountain Entrance/Exit Line project of Shenzhen subway line 7 underneath the North Ring Road, a numerical calculation model is set up by three-dimensional finite differential software FLAC3D under combination of numerical simulation and field monitoring to analyze the characteristics of ground surface settlement and stratum settlement during construction of the V-shaped tunnel underneath the existing road, and a comparison and demonstration is conducted by field monitoring and measurement. The results show: 1) the ground settlement trough mainly presents in a Y shape; 2) the superposed effect of the crown settlement trough is obvious when the interval of two tunnels is less than 2.0D, and the superposition of ground surface settlement increases greatly when the interval of two tunnels is less than 4.0D; and 3) the influential scope of overlying ground deformation decreases with an increase of the depth. The effect of advanced support on ground surface settlement is described and a comparative study of the parameters for advanced grouting is conducted so that the construction method and support measures are optimized.
KeywordsStratum with a soft upper part and a hard lower part,   Metro tunnel,   Numerical simulation,   Ground sur? face settlement,   Grouting parameters,   Monitoring and measurement     
Cite this article:   
.Deformation Law of a Metro Tunnel underneath an Existing Urban Road in Combination Soft/Hard Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2017,V54(6): 126-135
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2017/V54/I6/126
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY