Application of Vertical Freezing Technique in the Deep-buried Mountain Railway Tunnel
(1 China Railway First Survey and Design Institute Group Co., Ltd., Xi′an 710043; 2 Yankuang Xinlu Construction Development Co.,Ltd., Jining 272000)
Download: PDF (3884KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun? nel body passes through F2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing reference and guidance for similar tunnel construction.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
KeywordsMountain railway tunnel   Fault zone   Tertiary sandstone   Vertical freezing technique   Application     
Abstract: The strata of Chengershan tunnel is mainly consist of the slightly cemented tertiary sandstone, the tun? nel body passes through F2 fault core zone. Geological disasters of mud outburst, sand gushing and extrusion of work face occurred several times during tunnel construction, so the risks are very high. In view of the core zone of F2 fault with high pressure and abundant water, a variety of construction schemes were compared and analyzed in terms of technology, feasibility and safety, and vertical freezing technique was used for stratum reinforcement in the railway tunnel for the first time, furthermore the freezing scheme and tunnel support measures were studied, providing reference and guidance for similar tunnel construction.
KeywordsMountain railway tunnel,   Fault zone,   Tertiary sandstone,   Vertical freezing technique,   Application     
Cite this article:   
.Application of Vertical Freezing Technique in the Deep-buried Mountain Railway Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(6): 176-182
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2018/V55/I6/176
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY