Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2019, Vol. 56 Issue (2) :92-97    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study of Reinforcement Parameters of Fiberglass Bolts for the Large Cross-section Tunnel Working Face in Xigeda Formation
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 China Railway Eryuan Engineering Group Co., Ltd., Chongqing 610031)
Download: PDF (1819KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Due to poor water stability of the Xigeda formation, its engineering property will deteriorate quickly up? on encountering water. The tunnel construction activities in the Xigeda formation may induce large deformation of surrounding rocks and collapse of tunnel face. The reinforcement parameters on the face of large-section tunnel in Xigeda formation were studied by numerical simulation and theoretical analysis based on ADECO-RS and the Tongzilin tunnel project on Chengdu-Kunming railway, and it determines that distribution density of bolts is 0.65 every square meter, the reasonable reinforcement length of bolts is 8-11 meters based on longitudinal failure depth, established failure mode of unstable tunnel face in Xigeda formation, with the lap length of bolt is 4 m on the basis of distribution depth of plastic zone in front of tunnel face.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Zhijie1 YANG Bao1
2 GAO Jingyao1 ZHOU Ping1
KeywordsXigeda Formation   Large cross-section tunnel   ADECO-RS approach   Fiberglass blots     
Abstract: Due to poor water stability of the Xigeda formation, its engineering property will deteriorate quickly up? on encountering water. The tunnel construction activities in the Xigeda formation may induce large deformation of surrounding rocks and collapse of tunnel face. The reinforcement parameters on the face of large-section tunnel in Xigeda formation were studied by numerical simulation and theoretical analysis based on ADECO-RS and the Tongzilin tunnel project on Chengdu-Kunming railway, and it determines that distribution density of bolts is 0.65 every square meter, the reasonable reinforcement length of bolts is 8-11 meters based on longitudinal failure depth, established failure mode of unstable tunnel face in Xigeda formation, with the lap length of bolt is 4 m on the basis of distribution depth of plastic zone in front of tunnel face.
KeywordsXigeda Formation,   Large cross-section tunnel,   ADECO-RS approach,   Fiberglass blots     
Cite this article:   
WANG Zhijie1 YANG Bao1, 2 GAO Jingyao1 ZHOU Ping1 .Study of Reinforcement Parameters of Fiberglass Bolts for the Large Cross-section Tunnel Working Face in Xigeda Formation[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(2): 92-97
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2019/V56/I2/92
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[3] CHEN Zhuoli1,2 ZHU Xunguo1,2 ZHAO Deshen1,2 WANG Yunping1,2.Research on Anchorage Mechanism of Yielding Support in the Deep-buried Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 16-22
[4] WANG Quansheng.Case Study Based Analysis of Segment Division Principles of Rectangular Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 23-29
[5] ZHANG Heng1 ZHU Yimo1 LIN Fang1 CHEN Shougen1 YANG Jiasong2.Study on Optimum Excavation Height of Middle Bench in an Underground Cavern Based on Q System Design[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 30-37
[6] LI Hao.Geological Survey on Breakthrough Section of the Large-section Karst Tunnel by Radio Wave Penetration Method[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 38-42
[7] CEN Peishan1 TIAN Kunyun2 WANG Ximin3.Study on Gas Hazard Assessment of Yangshan Tunnel on Inner MongoliaJiangxi Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 43-49
[8] ZHU Jianfeng1 GONG Quanmei2.Centrifugal Model Test on Long-term Settlement of Shield Tunnels in Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 49-55
[9] CHEN Youzhou1 REN Tao2 DENG Peng2 WANG Bin3.Prediction of Tunnel Settlements by Optimized Wavelet Neural Network Based on ABC[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 56-61
[10] WANG Dengmao TENG Zhennan TIAN Zhiyu CHEN Zhixue.Reflection on Disease Treatment and Design Issues of Unconventional Rockburst of Bamiao Tunnel on Taoyuan-Bazhong Highway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 62-68
[11] WU Shuyuan1 CHENG Yong1 XIE Quanmin2 LIU Jiguo1 CHEN Biguang1.Analysis on the Causes of the Large Deformation of Surrounding Rocks of Milashan Tunnel in Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 69-73
[12] WANG Sui1,2,3 ZHONG Zuliang3 LIU Xinrong3 WU Bo1,2,4 ZHAO Yongbo1,2 LI Zhantao1,2.D-P Yield Criterion Based Elastoplastic Solution of the Circular Pressure Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 74-80
[13] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[14] ZHANG Kai1 CHEN Shougen2 HUO Xiaolong3 TAN Xinrong4.Extension Assessment Model for the Risk of Water Inflow in Karst Tunnels and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 89-96
[15] LI Jie1 ZHANG Bin1 FU Ke1 MA Chao1 GUO Jingbo1 NIU Decao2.Site Data Based Prediction of Shield Driving Performance in Compound Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 97-104
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY