|
2019, Vol. 56(4): 113-118 DOI: | ||
Calculation Model of Earth Chamber Pressure during Non-Barrier Launching of EPB Shield | ||
(1 School of Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture, Beijing 100044;2 Beijing Urban Construction Group Co., Ltd., Beijing 100125;3 Shandong High-speed Real Estate Group Co., Ltd., Jinan 250098) | ||
Received null Revised null | ||
Supporting info | ||
|