|
2019, Vol. 56(4): 182-187 DOI: | ||
Application of Jacking Technology with Adjustable Counter Weights in Box Culvert Construction above Existing Metro Tunnels | ||
(China Railway 16th Bureau Group Co., Ltd., Beijing 100018) | ||
Received null Revised null | ||
Supporting info | ||
|