|
2019, Vol. 56(5): 1-12 DOI: | ||
Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology | ||
(1 Xinjiang Erqis River Basin Development and Construction Administration Bureau, Urumqi 830000;2 School of Civil Engineering,Beijing Jiaotong University, Beijing 100044) | ||
Received null Revised null | ||
Supporting info | ||
|