|
2019, Vol. 56(5): 35-41 DOI: | ||
A CBR-based Aided Decision Model for the Mountain Railway Tunnel Excavation Method | ||
(1 School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 2 Key Laboratory of High-speed Railway Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 3 Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|