现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2019, Vol. 56(5): 50-57    DOI:
Design Optimization for the Rapid Excavation of Inclined Shaft of the Long Tunnel and Construction Period Estimation
(1 State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300354;2 China Railway 19th Bureau Group Co., Ltd,Beijing 100176)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn