|
2019, Vol. 56(5): 133-142 DOI: | ||
Research on Pile Foundation Underpinning Technology for the Shield Tunnel Passing through Bridge Pile Foundation Group | ||
(Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031) | ||
Received null Revised null | ||
Supporting info | ||
|