现代隧道技术
 
    Home | About Journal |  Editorial Board |   |  Instruction |  Subscription |  Advertisement |   |  Download |  中文
 Office Online
  Search  
  Adv Search
2019, Vol. 56(5): 180-186    DOI:
Analysis on the Characteristics of Ground Surface Settlement Caused by EPB Shield Tunnelling in Fuzhou Soft Ground
(1 CCCC Fourth Harbor Engineering Institute Co, Ltd, Guangzhou 510230; 2 CCCC Key Lab of Environmental Protection & Safety in Foundation Engineering of Transportation, Guangzhou 510230)
Received null  Revised null
Supporting info
Copyright © 2011  Editorial By MODERN TUNNELLING TECHNOLOGY
Supported by:Beijing Magtech Co.ltd  Email:support@magtech.com.cn