|
2019, Vol. 56(5): 201-205 DOI: | ||
Application of Non-Curing Rubber Asphalt Coating in Waterproofing of Shield Tunnel Segment Joints in Water-rich Stratum | ||
(1 School of Geosciences and Info-Physics, Central South University, Changsha 410083; 2 Key Laboratory of Metallogenic Prediction of Nonferrous Metals and Geological Environment Monitoring of Ministry of Education, Central South University Changsha 410083;3 China Construction Tunnel Corp., Ltd., Chongqing 401320) | ||
Received null Revised null | ||
Supporting info | ||
|